A.15.PROD:13 - Lowering, Repair, and Refresh Conditions

An ordinary production-work claim lowers when its Work, Method enactment, Method applicability, intended production effect, affected referent, Work-part relation, Work-to-change predicate or local claim, or the criterion and its applicability consumed by the receiver is missing.

An inception claim lowers when its identity specification and applicability, identity-closing Work, actual effects, Work-to-change and change-to-identity bases, or after-side entity cannot be recovered. A claim that this is the first satisfying boundary additionally needs an ordered candidate-boundary domain and an earliest-satisfying rule.

A completion use preserves a valid state-satisfaction claim whenever possible. That claim lowers only when its completion subject, criterion and applicability, boundary, boundary-state facts, or state-satisfaction predicate is missing. The separate Work-completion claim lowers when production Work or its closure predicate or local claim is absent; loss of that link does not erase the state-satisfaction claim.

An ordinary positive claim needs no materialized substrate document. A negative claim needs the selected substrate’s applicable negation law. A pin-triggering or earliest-boundary use needs only the constructor, witness, polarity, ordering, or time semantics it consumes; missing required semantics yields the missing-substrate blocker. A representation, record or publication may carry the required declared semantics or evidence. Its form or presence alone supplies no missing operator or rule.

A maintainer MUST repair only the affected local claim when later information changes work identity or parthood, a direct work-to-change fact, the identity-specification episteme or its applicability basis, the completion-criterion episteme or applicability relation, a boundary state, a relied-on base-predicate edition, or the selected substrate edition or constructor semantics.

An earlier inception or completion claim remains indexed by the specification or criterion episteme and applicability basis used at its boundary.

An obtaining C.2.1 EpistemeEditionRelation can trigger lineage-aware refresh of current dependent uses but does not rewrite that claim; a specification whose continuity is negative or unresolved needs an independent applicability judgement.

A later transformation, delivery, acceptance, release, publication, or availability claim does not by itself repair or invalidate an earlier production claim.

A relying practitioner MUST refresh an earlier claim after a change to its identity-specification episteme or applicability basis, completion-criterion episteme or applicability relation, any relied-on C.2.1 EpistemeEditionRelation, relied-on base-predicate edition, selected substrate edition, constructor semantics, witness or hidden-participant policy, polarity law, temporal policy, work-continuity policy, evidence basis, reference scheme, claim scope, or receiving use.

Follow an obtaining edition relation only to discover the continuing later episteme, then re-evaluate that episteme’s applicability for the current use.

A separately identified replacement with unestablished continuity carries no warranted lineage or inherited applicability; keep continuity unresolved until its rule decides it.

Refresh claim currentness and reliance separately from the historically indexed occurrence, specification or criterion episteme, applicability, and boundary facts.

A maintainer MUST reopen source binding only for the branch whose practice answer changed: a changed Scrum Definition-of-Done rule reopens the software-Increment branch; a changed NASA realization, verification, validation, or transition rule reopens the affected systems-engineering completion use; and a changed IMO identification rule reopens regulated ship designation and continuity, not a generic entity-inception claim.

A new source that answers cross-domain whole/proper-part production-work attribution reopens section 4.3 and the FPF synthesis hypothesis.

A changed comparator reopens only the information, evidence, analogy, or lineage boundary it supports unless a direct subject rule also changes.