Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-23 00:01:58 UTC · snapshot created 2026-11-23 00:02:28 UTC · last check 2026-11-23 06:10:10 UTC

A.19.ULSAM:5 - Archetypal grounding (didactic, informative)

A.19.ULSAM:5.1 - Tell

  • In CHR, ULSAM exists to keep the stage fold_Γ? explicit: if a pipeline wants folding, it invokes ULSAM.Fold_Γ; otherwise it skips the stage. Folding MUST NOT be smuggled into USCM.Score, CPM.Compare, or SelectorMechanism.Select.
  • For a U.System decision: ULSAM folds the admitted measures about the named System, under the declared grouping or membership basis and CG-Spec fold policy, only when that aggregate result is needed.
  • For a U.Episteme assessment: ULSAM folds the admitted evidential or measurement set about that episteme into an aggregate coordinate, using an aggregation model justified for that quantity and support dependence; reliability-like wording alone supplies no weakest-link law.

A.19.ULSAM:5.2 - Show

Scenario A (manager-facing): assess a proposed aggregate readiness measure.

  1. A CHR pipeline produces a set of admitted measures (post-USCM or directly from characteristic measures): MeasureSetSlot = {m₁, m₂, …, m_k}.
  2. The team wants a single “readiness” measure m_ready to be used as an input to later comparison/selection. Define the question this aggregate would answer and its acceptance or comparison use; a readiness label supplies no aggregation law.
  3. Before folding, answer:
    • Admissibility: Is the fold admissible under CGSpecSlot.SCP (units/scale) and CGSpecSlot.Γ_fold (declared fold kinds)?
    • Evidence: Is the evidence posture sufficient under MinimalEvidence? If not, do we degrade or abstain?
    • Policy identity: What is the identity of the fold (which ΓFoldRef, which edition)?
  4. When those conditions hold, the application computes: Fold_Γ(MeasureSetSlot, CNSpecSlot, CGSpecSlot, GammaFoldSlot, MinimalEvidenceSlot?) → (AggregatedMeasureSlot, ContributorSetSlot?). The audit records ΓFoldRef and makes the actual contributors recoverable, with the optional contributor output when needed. If no justified fold answers the readiness question, retain the separate measures and their criteria.

Scenario B (engineer-facing): proposed aggregation across different bases.

  • A project tries to fold measures with different bearers, membership rules, scales, comparison bases, or reference planes. ULSAM first checks whether one admitted set and lawful fold can be stated. If the conclusion relies on an F.9 Bridge, kind relation, aggregation or membership relation, or plane relation, the project cites that obtaining relation and its loss. If a required relation is absent or unresolved, keep independently supported folds separate or abstain from the dependent fold.