Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-10-14 19:58:00 UTC · snapshot created 2026-10-14 19:58:38 UTC · last check 2026-10-15 03:55:10 UTC

A.3.1.MI:4.3 - What Changes in Practice

Teams stop reporting that a Method was “rolled out” and start distinguishing the Method-related target, the introduction strategy and its status, its description, any separate WorkPlan, performed introduction Work, later Work, named relied-on relations, and separate observations. An introduction attempt can be completed without establishing the intended conditions. A favourable outside result can remain useful without filling every observation position or becoming causal proof.

Revision becomes local. A stale target description, unsuitable target variant, failed support relation, missing capability result, weak introduction strategy, stale strategy description, unworkable WorkPlan, or local-use adaptation can be reconsidered through its own maintained claim or edition without repeating or rejecting the entire programme.