C.32.LCA:5.3 - The smaller sufficient result
A machine already has an applicable controller, command range, state estimate, timing qualification and recovery procedure. The proposed change only redraws their representation for a maintenance team. Use C.30.LCA to make the obtaining relations and limits recoverable. Do not repeat architecture synthesis unless that reading exposes a consequential missing or changed relation.
Similarly, a team can retain an adequate allocation when a new report does not change any action, deadline or protected condition. More communication is not a required improvement.