Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-10-14 19:58:00 UTC · snapshot created 2026-10-14 19:58:38 UTC · last check 2026-10-15 02:30:07 UTC

C.40.PC:12 - Relations

  • Receives from C.40.OI and C.40.NU: the bounded inquiry and leads whose receiving contribution remains uncertain; adequate direct inputs may be reused.
  • Uses C.40.OC: characteristics and scales needed to make a worth or contribution claim interpretable.
  • Can supply a selected problem-structuring Method: the bounded problem/contribution account and unresolved formulation question for a separate decision-support inquiry.
  • Uses A.2.3: identity and conditions of relied-on promise content, distinct from commitment and provision.
  • Uses A.15.9: the smallest missing outside-practice result and its reliance boundary, without performing the supplier’s Method.
  • Supplies C.40.DC: worthwhile problem/proposed-contribution accounts, including explicit hypotheses and acceptance expectations.
  • Supplies C.40.JF: the value and contribution claims whose necessary transitions still need qualification; a worthwhile problem is not a reachability verdict.
  • Uses C.40.RQ: local requalification when receiving need, source, acceptance, protection, or horizon changes.