Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-10-14 19:58:00 UTC · snapshot created 2026-10-14 19:58:38 UTC · last check 2026-10-15 04:35:10 UTC

C.41.SR:8 - Common Anti-Patterns and How to Avoid Them

FailureRepair
All local passes are treated as a whole-result pass.Examine the combining relation and the whole’s additional conditions.
Everyone uses “ready” with a different meaning.Recover the actual local claims before summarizing.
A missing assignment and an unknown result share one status.Name whether the next contribution is enabling work or an observation.
Every change restarts every checklist.Follow the changed premise through actual reliance and retain sufficient unaffected grounds.
A master form displaces local views that participants need.Connect the needed claims at the smallest worthwhile granularity.