Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-10-24 00:55:11 UTC · snapshot created 2026-10-24 00:55:56 UTC · last check 2026-10-24 01:40:20 UTC

C.43:12 - Relations

  • Apply C.11.CRC to construct the contribution of a finite configuration change and C.11 to choose among warranted alternatives.
  • Apply C.11.DUA to decide whether further advice, observation or computation can improve the receiving choice enough to justify its burden.
  • Apply A.15.7 for the immediate action within an understood working Method; use this pattern when its connected control basis is still unresolved.
  • Apply C.11.DBR when subsequent evidence changes a relied-on decision premise.
  • Apply C.30.LCA to recover a control structure and C.32.LCA to construct or change it. Those results can supply the arrangement used here.
  • Apply C.39 when a needed way to obtain a contribution is missing, C.28 for a causal question and C.29 for the mathematical representation that supports a required inference.
  • Apply C.40.OD for the whole construction of open-ended development; use C.40.DC, C.40.JD and C.40.NP to construct directions, realize the joined development and continue from its results. §4.8 connects these results to control and recommendation.
  • Use B.1.5.RS for the consequences of replacing a constituent Method, C.32.MWA.PP for whole performance arrangements, and C.30.ILC with C.32.MLAO when the intervention addresses an architecture residual between the identified scopes.
  • Use A.22.CGUS to retain the connected reasoning through the mantra.