Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:55:15 UTC

CAD.4:5.2 - Carry the mathematical result into execution

The planner proposes a next endpoint and applicability time. The reference generator checks that the segment starts at the current reference, remains in [-0.9,0.9], and advances by at most 0.05 per fast tick. The fast law uses that generated reference, not the endpoint held for four ticks. An unavailable segment leaves the reference unchanged; the initialization error must satisfy the bound.

A hardware test that reveals a one-tick delay in actuation changes x_{k+1}=x_k+u_k into a model with an input delay. The table is no longer sufficient evidence. Return to CAD.2 to derive the delayed dynamics and to CAD.3 for the resulting margins. Retain the comparison of command meanings and the source-independent arithmetic; do not retain the unqualified physical feasibility conclusion.