The full source comparisons belong with the affected Methods. CAD.5:11 distinguishes the historical diversity-enabled sweet-spot model, internal prediction and applied-action feedback, bounded-set estimation and stochastic sensor scheduling. DeSS compares complementary components under a task and resource model; IFP concerns a controller’s reuse of internal information. Neither establishes the other. The selected bounded-set construction is used because the stated task asks for hard sampled constraints, not because it is universally superior.

CAD.1–CAD.4:11 compare decomposition, reduced-model interfaces, invariant margins, governors, safety filters, inexact computation and switching under their different conditions. A reference governor can preserve a qualified loop; a safety filter changes the applied control law and therefore the error calculation; separate stable switching modes do not establish a common invariant domain. A more recent result matters when it changes the usable construction or comparison, not merely because it has a later date.

External supplying publicationContribution used hereReceiving use and return
FPF Core, C.32.LCAGeneral construction of complete control-architecture alternatives and their joint conditionsCAD supplies the specialized numerical constructions. A changed general architecture requirement reopens the affected framing, not an unchanged algebraic identity.
FPF Core, C.30.LCAAdequacy of a control-structure viewA view must expose the information, authority, timing and lower guarantees needed for its use. Its adequacy does not prove a control bound.
FPF Core, A.3.3.PIRetaining information needed by future prediction and updateCAD.5 constructs a particular sufficient internal state and explains what a reduction must preserve.
FPF Core, C.39 and C.32Construction of useful connected ways and whole architecture alternativesCAD.1 and CAD.4 use those general operations with control-specific models, alternatives and constraints.
Systems Engineering DPF, SYSE.5 and SYSE.6Functional organization, bearer alternatives and the system architecture decisionCAD results can supply that wider work. Control feasibility neither chooses every system bearer nor settles the whole project.
Mathematical Modeling DPF, MMP.9, MMP.18 and MMP.22Model reduction, compatible coupled models, and transformation of mathematical operations into workable performanceCAD.1–CAD.4 provide the control-specific receiving operations. A changed model exchange or computational realization reopens the error or deadline premise that uses it.

These remain external contributions. Core does not require this DPF for its own applications. Select an obtainable edition of a supplying publication and the exact relied-on content before applying it; a locator or title alone is not that content. If a relied-on premise changes, revisit its receiving use. If only the carrier or publication date changes, inspect compatibility rather than assuming either breakage or preservation.

For the domain construction, a changed plant, measurement model, uncertainty, command objective, admitted switching, timing or resource arrangement reopens the dependent calculation. A source correction reopens the particular claim imported from it. Unchanged information, interface or model results remain usable under their original conditions.