Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 20:40:20 UTC

Part III - Shared and extended coordination

ECO.7 - Coordinate Use and Renewal of a Shared Resource

Type: Method pattern Status: Stable

ECO.7:1 - Problem frame

Use this Method when separate uses of a shared resource or insufficient upkeep put its useful condition at risk. Identify the condition and the actions that affect it. Assess the existing rules or, if a change is needed, develop a workable arrangement for use, renewal and adaptation from the rights, resources and contributions available. Involve the participants whose contribution the design requires. For a proposal, identify whose agreement would put it into effect. Obtain that agreement when adoption is part of the work.

For routine allocation of a machine under adequate rules, use the applicable OPS Method. Use ECO.7 when different claims, contributions or effects on the shared resource require examination.

ECO.7:2 - Problem

A withdrawal that fits one user’s plan can deprive another user or leave too little for renewal. Cutting withdrawals may still leave upkeep unfunded. Include affected downstream and seasonal users and people whose rights or access are easily overlooked. Establish the physical limit, actual rights and provision for upkeep from their respective grounds.

ECO.7:3 - Forces

Observing withdrawals, upkeep and exclusion can cost time and money. Participants may differ in knowledge, needs, alternatives and power. Check whether a local rule shifts a cost beyond its boundary and whether a common rule covers relevant local differences.

ECO.7:4 - Solution

ECO.7:4.1 - Recover the resource and the actions that affect it

Start with the use or condition that someone must protect, its location and its deadline. Trace the resource to the users, places and periods where a withdrawal, replenishment, loss or change of quality could affect it. Hold total stock fixed and change where or when it is accessible. If the same total permits different deliveries, keep the local stocks, connections or access times needed to distinguish them. Identify who can change those conditions, including parties outside the original group. For a question about one protected outlet, an adequate reading there can already establish what it received.

Use a physical or operating account that fits the resource. Water delivered to a site can be subject to a flow limit and a required reserve. For a shared manual the copies may be freely reusable while qualified support time is scarce. Locate the scarce contribution before choosing what to count. Use PHY, MMP or OPS when a missing fact or model matters. Establish rights to use the resource from the applicable rules or agreements.

Identify the current rights of access, exclusion and withdrawal. Compare them with what participants can do and what they have done. A proposed allocation takes effect through the applicable decision or agreement.

ECO.7:4.2 - Construct a workable combination of rules

Start with the rules that govern the question. They can concern entry, quantities, timing, upkeep, observation, dispute resolution or authority to change the arrangement. Use suitable existing rules. To design one, identify an allowed action or omission that could defeat the protected use, and find who could change that outcome in time. A withdrawal limit may protect a downstream flow. It leaves an unfunded maintenance duty open. Work back from each required result to the decisions or contributions that would secure it. Check whether the proposed combination is attainable and retains the rights the parties must preserve.

Assess whether participants have the means and incentives to comply. Include the costs of observation and response, especially for smaller users. Before treating an event as a violation, check what the observation establishes. A missed reading may be a measurement problem. For an established violation, match the response to its effect and the applicable rule.

Trace effects beyond a local arrangement. Several communities may use one catchment or infrastructure even if they allocate separately. Identify the common constraint. Where an operating arrangement is needed, establish how it can handle that constraint while preserving legitimate local decisions.

ECO.7:4.3 - Test ordinary use and changed conditions

Start with the use or condition the rule protects. Follow the permitted actions of the participants and determine how their combination affects it. Vary a condition to which the rule has to respond and establish whether it still protects that use. For example, to assess water delivery, choose the receiving site and period. A complete reading at the outlet may give the delivered amount directly. To calculate it from an upstream reading, follow the resource from that point to the outlet. Deduct withdrawals and losses along that route. Add intervening inflows, including returns or replenishment that reach it in time. For storage on the route, use either the net change in stock or the gross flows into and out of storage. With an inflow of 100, 10 stored and 5 released in time, 95 reach the outlet if nothing else changes. Subtracting the net increase of 5 already accounts for that release.

Identify which withdrawals can all occur within the period, including sequential draws on the same stock. For delivery, establish the quantity or quality guaranteed at the receiving point, or a sufficient bound. For renewal, start with the resource’s condition and stock, allow for regeneration by the relevant date, and check the reserve or condition required then. A fishery can deliver its whole authorized catch this season and still leave too little breeding stock for the next.

Test the promise the rule actually makes. A right to ask for 50 can coexist with a rule that guarantees less to that holder while protecting a common reserve. A permitted combination that breaches the promised minimum or coverage refutes that guarantee for the proposed rule. To exclude every rule, show why each authorized rule, acting on the information available at each choice, would breach that same promise in some permitted conditions. Before the requester is known, two branches of a canal could require mutually exclusive early releases even though either request could have been met with advance notice. If rights are independently exercisable, capping their joint take may require changing the agreement.

For a claim about actual use, identify the event that counts for the named participant and period. A record of work received may establish how much shared service the participant used. For water, a meter, an agreed delivery record or a water balance may establish a quantity or a bound. A positive lower bound on use establishes some use. A bound on delivery alone leaves open how much is still in storage. An access right supports a claim about permitted use. A complete record of requests can establish what people asked for. Deriving physical use from it also requires a connection to what was delivered or taken. If entry, a missed upkeep payment or conflicting readings can change the service, establish who can detect the change and who can respond under the applicable rules. An earlier case or test may already show how the rule works under the conditions in question. Return the supported allocation, guarantee, observation or limit needed for this decision. Reconsider it when the inflow, delivery losses, access rights or available response change.

ECO.7:5 - Archetypal Grounding

ECO.7:5.1 - Sharing water while retaining a downstream flow

Suppose 100 units enter a canal today. There are no other inflows, losses, changes in storage or returns. Upstream users consume what they withdraw, and downstream users must receive at least 40 units. If two groups can independently take 50 and 40, they can take both amounts and leave just 10 downstream. The guarantee then fails. If a gate under an enforceable sharing rule limits their combined take to 60, at least 40 reach the downstream users. That combined limit can settle the downstream guarantee. To decide either upstream group’s entitlement when the requests exceed 60, establish who may allocate the shortfall and on what terms.

The parties know the day’s controlled inflow before withdrawal and can adopt a new arrangement. With inflow of 100, allowances of up to 35 and 25 guarantee at least 40 downstream. Exactly 40 arrive if both groups draw their full allowances. If 5 units are instead lost before delivery, full draws leave only 35. To report today’s delivery, the caretaker can read the outlet meter or derive it from the inflow, actual withdrawals and losses. The caretaker can check gates and perform specified routine upkeep for €40 per week. Each group can pay €20. Larger repairs need a separate decision.

Return to the canal with no losses. The adopted agreement allows the caretaker to set allowances of 20 and 20 on an 80-unit day. Each group can meet its essential needs at 20. The caretaker announces the allowance before withdrawal and checks what happens. When two credible readings differ between 80 and 100, the parties temporarily use the lower allowance and jointly check the meter. Disagreement alone leaves the cause open.

With 80 units, withdrawals of 20 and 20 leave the required 40 downstream. Below 80 the stated essential uses cannot all be supplied. The caretaker must report that limit. If one group misses its €20 weekly payment and the other pays, the funded €40 reserve covers two weeks of the shortfall. If both groups miss their payments, it covers one week of upkeep. Once the reserve runs out, continuing service requires a replacement contribution or a feasible reduced plan. The case stipulates these means and commitments.

ECO.7:5.2 - Information and the services needed to use it

Several teams can copy a software manual without exhausting the copies. They can, however, exhaust a shared service’s processing capacity or its maintainers’ time. Identify which contribution is scarce before applying a withdrawal or access rule.

ECO.7:6 - Bias-Annotation

Identify dispersed or downstream users who bear consequences even if better-organized participants speak for themselves. Equal percentages can yield different results when rights or needs differ. Explain the physical consequences and the interests affected before drawing a conclusion about fairness.

ECO.7:7 - Conformance Checklist

For a report on actual use or delivery, establish what the available evidence supports about the event the recipient asked about, for the named user and period. For a promised allocation, establish which rights can be exercised together and what can reach the protected user within the promise. For a continuing arrangement or a proposed change, establish how the required provision or adaptation can be sustained. When a change or trial is requested, identify who can put it into effect and what observable result would warrant adapting it.

ECO.7:8 - Common Anti-Patterns and How to Avoid Them

  • Allocation is treated as physical feasibility. Check the resource account and time window.
  • Upkeep is expected to happen by goodwill alone. Recover its contribution and means, or reduce the promise.
  • A successful local rule is copied into a different setting. Check whether the receiving resource, users, means of observation and wider effects support the proposed use.

ECO.7:9 - Consequences

A shared-resource arrangement can protect required uses while allowing changes in supply. Several centres of decision may respond well to local conditions, but they also need ways to coordinate, maintain the resource and handle disputes. Assess the actual arrangement under its conditions.

ECO.7:10 - Architectural Rationale

Relate physical conditions, rights, participant actions and decisions where they affect one another. A workable allocation needs both a physical basis and an arrangement under which it can take effect. A report on one of these questions can use a narrower account.

ECO.7:11 - SoTA-Echoing

Ostrom (2010), sections IV and VII provides a basis for comparing shared-resource institutions and interacting decision centres. We adopt the comparison of feasible rules in their settings, including the effects of ownership arrangements where relevant.

Baldwin and colleagues (2024) identify limits in the evidence about polycentric arrangements and examine their context and changes over time. The canal case illustrates a local comparison and when to revisit it. Use a single operator’s established allocation if it meets the need. A claim that one arrangement performs better requires comparison under the relevant conditions.

ECO.7:12 - Relations

Use ECO.8 for wider coordination and ECO.9 when the rules or their implementation need to change. Use OPS for operating allocation and upkeep, and PHY or MMP for a missing physical account or model. Identify applicable rights and authority. Use OCE if an organizational change is selected.

ECO.7:End

ECO.8 - Join Direct Cooperation with a Wider Economic Order

Type: Method pattern Status: Stable

ECO.8:1 - Problem frame

Use this Method to decide how participants in one undertaking can coordinate their contributions, or when a rule from one relationship is being applied to another. An expectation of voluntary help can fail in an external service agreement. Pricing every small contribution can disrupt direct cooperation. Identify the interaction and the conditions that make it work. Establish which parts need direct coordination, agreed terms, prices or a wider rule.

The result can be a supported finding about the relationship, an adjustment that addresses a mismatch or the condition still unresolved.

ECO.8:2 - Problem

A group may expect an outside supplier to share its purpose, local knowledge or willingness to help. That expectation can lead it to promise work the supplier cannot or will not provide. Inside a team, pricing every small contribution may remove discretionary help or shared learning. Explicit terms may instead clarify an otherwise disputed obligation.

Personal knowledge, organizational assignment and exchange can all govern different parts of the same action. Identify the relation that matters to the work. The group’s size alone leaves that question open.

ECO.8:3 - Forces

Direct coordination can use rich local knowledge but is costly to extend. General rules and exchange terms allow different purposes to coexist but can omit particular needs. Some shared resources require coordination beyond bilateral exchange; a central command requires authority and knowledge it may not possess.

ECO.8:4 - Solution

ECO.8:4.1 - Recover the interaction and its coordination conditions

Start with the result the coordination must support. Identify which participants make decisions that can change it and the rule that connects those decisions. Their use of separate contributions can be linked by a common limit. Where one party supplies another, vary the timing, specification or amount and ask who can decide what the other receives and on what terms. Trace the relationship up to a wider agreement or shared resource when it constrains that decision. Follow it inside an organization when people within it have different powers, information or commitments. A rule for the whole service can suffice when it already determines the answer. For the relations that matter, establish what sustains the required contribution, such as shared purpose, personal knowledge, an assignment, a continuing agreement, a price and specification, or a general access rule.

Personal knowledge can support cooperation. Authority to direct another participant’s work requires its own basis. A contract can connect two separately performed contributions, while a constituent operation forms part of the encompassing work. Distinguish the relations relevant to the supply chain, institution and composition of Methods.

ECO.8:4.2 - Find the unsupported transfer of a rule

Assess how the proposed rule would work in the receiving relationship. Which information, agreement, trust, authority or capacity to bear cost does it require? Check whether those conditions are present and whether using the rule would remove a needed contribution.

To arrange coordination, work backward from the required result to the decisions that must fit together. Identify what participants may decide for themselves, which decisions someone can direct and which changes require another party’s agreement. Build on the discretion, terms or common rule that can secure that result. For shared constraints use ECO.7. Where an existing rule has been proposed for a new site or relation, preserve or adapt it according to which of these conditions still hold there.

Compare whose purposes and alternatives the repair serves and what it costs others. A current price helps strangers exchange without common goals, but cannot by itself settle every affected right or shared-resource effect.

ECO.8:4.3 - Carry the boundary into the work

Identify how each relevant participant can act under the applicable rule or relationship. The same person might offer voluntary help in one situation and supply a paid service in another. Make the terms clear enough to distinguish a request from an invocation of an existing commitment.

When the result depends on how methods are composed, show what each constituent method does for the encompassing one. Checking a supplier’s terms can be part of arranging a service that is part of developing a venture. For an actual delivery, examine what the undertaking commissions. A supplier can perform an agreed part of that delivery. A buyer can also use an earlier report the supplier produced independently. In the first case the combined delivery depends on the promised performance. In the second, a usable report may suffice without commissioning that work again. A fee or exchange of information alone leaves the composition of the methods and the work open.

Return the supported account of the coordination, any proposed adjustment or the problem still open. Use OCE or CGOV when a selected change affects organizational arrangements or corporate authority.

ECO.8:5 - Archetypal Grounding

ECO.8:5.1 - A community kitchen buys reliable maintenance

Suppose volunteers at a community kitchen rearrange tasks in conversation and help one another during a difficult shift. The kitchen also needs a refrigeration contractor able to respond outside its normal shift.

Volunteers’ expectations of mutual help do not secure a response from the contractor. Pricing every small favour among volunteers would change the kitchen’s internal cooperation. The kitchen keeps that cooperation and specifies the coverage and contact terms it needs from a paid service. Use ECO.4 to establish whether that service can be obtained and ECO.6 where later dependence on the contractor affects adaptation.

If a volunteer is also the contractor, the two relations still differ. The person needs to know when the kitchen requests voluntary help and when it invokes the paid commitment. A request to explain who covers a breakdown can be answered from the effective service terms. To design an arrangement for the next breakdown, start with the response the kitchen must secure. Establish who can recognize the incident, call on coverage and get someone to the equipment in time. Paid stand-by, help inside a shift or a combination can serve if the undertaking’s authority, timing and resources support it.

ECO.8:5.2 - Local water agreements share a wider constraint

Two canal groups allocate within their areas. Each local rule can be feasible while their combined withdrawals exceed the common supply. That joint limit can answer a question about present feasibility. If a workable arrangement is required, connect the allocations through the physical limit and a decision the parties can carry out.

ECO.8:6 - Bias-Annotation

Identify which cooperation or exchange the relation can support and who could be excluded or burdened. Personal solidarity and impersonal exchange each have conditions that may be absent in this case.

ECO.8:7 - Conformance Checklist

Which use does the coordination have to support, and which decisions may participants make under each relevant relationship? For a rule used in another setting, establish whether its conditions hold there. For a proposed arrangement, establish how the contributions together meet the requirement under the applicable rule. Include any necessary handovers, terms for external services and decisions or shared limits that can change the result. When the order concerns a single relationship, return the conclusion that its terms support.

ECO.8:8 - Common Anti-Patterns and How to Avoid Them

  • The economy is treated as one organization. Establish where shared authority and information exist and how the remaining contributions are coordinated.
  • Every relationship becomes a spot transaction. Preserve a continuing cooperative contribution when the result depends on it.

ECO.8:9 - Consequences

A practitioner can connect a local undertaking to wider economic activity without erasing the conditions of either. Some disagreements become clearer because they concern which relation applies. Coordinating commitments across these arrangements also takes work.

ECO.8:10 - Architectural Rationale

Different coordination mechanisms allow participants to use their own knowledge and pursue distinct purposes. Identify the boundary from what the participants can obtain and do through each relation. A separate question is which operations form parts of the same work.

ECO.8:11 - SoTA-Echoing

Hayek, The Fatal Conceit, chapter 1, pp. 18–19 discusses simultaneous participation in overlapping local and extended orders. We adopt that distinction for the coordination question. Claims about the biological or moral origin of those orders would require other grounds.

Ostrom’s comparative work includes arrangements beyond market exchange and central command. Use ECO.7 when a shared constraint needs coordination. A common organizational plan can work where authority, knowledge and resources fit. Reconsider the affected answer when parties, rules, purposes or shared constraints change.

ECO.8:12 - Relations

Use ECO.2 and ECO.3 for a response to changed prices or a new exchange, ECO.7 for shared-resource coordination and ECO.9 for the practice through which a rule works. FPF B.1.5 explains constituent and encompassing Methods, and C.36 supports cultural continuation. Use OCE or CGOV for a selected organizational or corporate change, and OPS for operating allocation.

ECO.8:End

ECO.9 - Decide Whether and How to Change Economic Rules through Their Working Practices

Type: Method pattern Status: Stable

ECO.9:1 - Problem frame

Use this Method to assess a rule for access, exchange, contributions or adaptation when someone questions how it works or proposes changing it. Identify which coordination the rule supplies in practice, whom it affects and what could change. If a new arrangement is needed, compare preserving, modifying or replacing that contribution under feasible transition conditions.

A finding about the current rule, a justified proposal or decision, a bounded trial, or an identified open condition can answer the task. When current evidence establishes urgent harm, identify what immediate protection is available under existing rights and authority.

ECO.9:2 - Problem

An inherited rule may preserve locally useful knowledge that nobody has fully articulated. It can also perpetuate exclusion or a constraint that no longer serves its purpose. Changing the wording may leave the practice untouched. Removing the rule may also remove access, trust or a way to adapt that participants still need.

Judge the rule by its consequences and applicability to the present use. Its age or the fact that it was deliberately designed does not establish that result.

ECO.9:3 - Forces

Recovering tacit know-how takes time, and delay can prolong harm. A trial may yield evidence while imposing real costs on participants. A local change can also affect other rules or be adopted under different conditions elsewhere.

ECO.9:4 - Solution

ECO.9:4.1 - Recover the practice and the pressure for change

Start with the use of the rule that matters to the recipient. To establish who is entitled to apply, the effective rule and its scope may suffice. To explain what happened to an applicant, follow that person’s case to the decision and its grounds. To design a change, identify which part of the present arrangements creates the difficulty, who experiences it and what access, supply, accountability or adaptation must be secured. A rule on the books, the practice people carry out and their means of supplying the service can each change separately.

Recover the useful contributions and burdens of the existing rule. Use a representative observation or a sufficiently grounded reconstruction. Obtain participants’ accounts when the question depends on their experience or information they hold. An existing record can suffice for what took place under the rule.

ECO.9:4.2 - Construct alternatives with a viable continuation

When comparing changes, include the feasible option of retaining the rule, amending it or using another arrangement. For each relevant option, identify who can act, what must be learned or supplied, and how expectations, commitments, entry and exit would change. Include people affected during the transition, including those absent from the original proposal.

If a trial promises continuing service under uncertain demand, establish the work owed through completion. Include the number and timing of cases, ordinary operations, material exceptions and final settlement. Use qualified evidence about the procedure and the work, such as records and a knowledgeable performer’s account. For an assurance of completion, obtain a bound covering the agreed cases and exceptions. Compare obligations with available qualified capacity in each interval, including work due after enrolment closes. Use OPS.13:4 for this comparison. If the bound or capacity is inadequate, obtain more provision, agree a narrower undertaking with those affected or state which promise cannot be made.

Trace the other rules and practices the new arrangement requires. If some users lack a needed capability, service or resource, identify the resulting exclusion. When the task is to preserve access, supply the contribution or revise the proposal. Changing the text alone does not provide it.

Use C.36 to distinguish creating a variant, transmitting it, selection among variants and retention in repeated use. A project decision can change a local arrangement within its authority. Wider adoption depends on what later users receive and do.

ECO.9:4.3 - Choose the next action at the scale its grounds support

Compare attainable gains, transition burdens and costs of waiting. An established urgent failure can warrant an available protective action within the holder’s authority. If a change requires another party’s agreement, that condition still applies. A reversible trial can test an open question. Greater or irreversible exposure may require stronger grounds before commitment. Use C.11.DUA to assess whether further inquiry is worth its cost.

For a proposed change or trial, identify what evidence would support continuation, adjustment or withdrawal. Use ordinary records when they supply it. After implementation, examine the practice people can perform and whether a previous contribution was lost. Return a supported finding or, if repair is needed, address the affected rule, provision or capability.

For an access claim, distinguish the right to apply, a usable opportunity and actual uptake. If the existing service remains available at its previous capacity and an authorized, staffed channel lets a formerly excluded person obtain the service in time, that person’s opportunity has widened even before a first application. To describe uptake, identify the population, period and unit the question concerns. Complete records of distinct participants can give their number. Several services received by one person can change a service count while leaving the participant count unchanged. To compare actual uptake across periods, allow for changes in eligibility and membership where they affect the comparison. For a causal claim, compare the same outcome with what would have happened under the earlier arrangement in comparable conditions. A bound on that counterfactual can establish the direction or minimum size of the effect. Include effects on people displaced or newly able to participate where the question covers them. Ten willing participants completing a trial establish ten completions. The same observation allows better or worse access for other users. A documented denial can settle one access complaint. A sufficient bound on demand and provision can justify the next trial.

ECO.9:5 - Archetypal Grounding

ECO.9:5.1 - Replacing informal credit with advance payment

Suppose a cooperative shop lets trusted customers pay at their next visit and keeps a small account record. A proposed online system requires prepayment before collection. Under the example’s conditions this would reduce some collection work and exclude customers who can pay later but cannot prepay.

The useful service is short-term credit based on local knowledge. The cooperative compares universal prepayment with limited credit accounts. Its authorized manager can offer a two-week trial to ten consenting customers, including newcomers. A €20 limit per account fits the €200 available beyond other commitments. A trained worker has two hours per week. Using the agreed procedure and existing cases of late payment, disputed purchase and final settlement, the worker and manager establish a weekly upper bound of two hours for ten checks plus one hour shared across reconciliation, exceptions and final settlement. This bounds all the promised work at three hours in each week. It leaves open whether routine operation fits two. The manager is qualified and can reserve one contingency hour in each week, two hours in all. The worker checks the agreed payment date against expected receipts and unpaid purchases, applying the same conditions to newcomers and existing users.

The manager chooses the trial to retain later payment and test whether routine credit work fits the expected capacity. Existing obligations and terms for other customers continue. At weekly settlement, account records show overdue balances, and the worker can report time spent and any refused purchase. Extend the arrangement only if the weekly work fits the continuing two-hour capacity, the combined overdue balance is at most €20 and customers retain the intended access. If week one consumes three hours, the manager uses one contingency hour, stops new enrolment and reserves the remaining hour for week two, including final settlement. The ten customers keep the promised service. Expansion waits for enough continuing capacity or a less demanding procedure. If the promised workload cannot be bounded, change the undertaking or secure adequate provision before offering it as assured.

If the old arrangement also favours friends and excludes newcomers in the same circumstances, retaining it unchanged would fail the access purpose. The revised arrangement needs a workable way to assess new entrants. If that work cannot be supplied, identify it as the missing condition.

ECO.9:5.2 - Copying a rule without its supporting capability

A neighboring cash-only shop copies the credit software but lacks anyone who can interpret exceptions and maintain limits. It can continue the cash service. Credit remains unavailable unless it can obtain a capable performer, suitable simpler terms or another provider. The software copy establishes none of those contributions.

ECO.9:6 - Bias-Annotation

A long-lived rule may no longer serve its users, and a new one may create fresh burdens. A successful local trial establishes what happened under its conditions. Include those who bear the transition when assessing its value and broader applicability.

ECO.9:7 - Conformance Checklist

Which question about the rule has been answered? Establish an entitlement from the applicable terms and the facts on which it depends. A report on use needs evidence about the people and period covered. A claim that the rule changed an outcome needs a comparison with what would otherwise have happened. For a proposed change, can participants supply the learning, resources, authority and transition work it needs? If the proposal is a trial, do the stakes, remaining uncertainty and available capacity justify it? State the supported finding or how the parties can respond if a premise fails.

ECO.9:8 - Common Anti-Patterns and How to Avoid Them

  • The old rule is irrational because its rationale is unknown. Recover the consequential practice before discarding it.
  • The old rule survived, therefore it is justified. Compare present benefits, harms and alternatives.
  • Publication of a rule is treated as capability. Establish how participants can perform, learn or obtain the required methods.

ECO.9:9 - Consequences

A change can preserve useful coordination while easing a burden or widening access. A desirable proposal may still lack a necessary capability. A sufficient current arrangement can be retained within its established conditions.

ECO.9:10 - Architectural Rationale

Participants sustain coordination under a rule through what they do and what they expect others to do. A revised rule can enter into force while participants continue to follow the previous practice. To assess a proposed revision, identify how participants would receive it, act under it and continue the useful work.

ECO.9:11 - SoTA-Echoing

Hayek’s The Fatal Conceit supplies a historical reason to examine what inherited coordination accomplishes. Whether to keep it depends on the present results, burdens and alternatives. Baldwin and colleagues (2024) examine the significance of context and long-term feedback in polycentric arrangements.

Use these questions with FPF’s account of cultural variation, transmission, selection and retention to compare arrangements in their setting. The constructed cases illustrate this reasoning. A claim of superior results needs appropriate comparative evidence. Reconsider a conclusion if practice, capabilities, wider effects or the grounds for retaining a rule change.

ECO.9:12 - Relations

Use ECO.7 and ECO.8 when shared resources or the connection between orders motivates a rule question. Use C.36 for cultural continuation, HCD or MDPE for the relevant capability or practice, and OCE for a selected organizational change. Use C.11.DUA to assess the value and cost of further inquiry. Use OPS.13 to compare workload with provision when continuing obligations are promised in a trial or changed service.

ECO.9:End