ACTUAL-TEMPORAL-STRUCTURE — Recover what actually obtains before testing coordination
- Situation: A cycle, onset list, trace, notation, or geometry is called rhythm, but may be a prescription, representation, Method unfolding, or account rather than what obtains.
- Question: Which subjects and relations support the selected structure, what grounds it, and is a coordination trial useful now?
- First useful result or blocker: A supported temporal claim, or the missing bearer, relation, observation or ground. Establish an A.22-selected structure or a separately identified C.2.1 account when the receiving use needs it. Keep future specifications and representations separate. For a selected coordination trial, add direct relations, conditions, observations, and next decision or stop.
- Start with: Begin with the changing subjects and the temporal claim needed for their use; C.27.TA supplies its conditions. Use A.3.4 or A.15.1 for a needed change or Work claim, A.22 when the organization requires a selected structure, and C.2.1 when its account needs separate identity. Preserve the distinctions among structure, account, future specification, representation, Method unfolding and Work. For coordination, name bearers and direct relations. Only when a trial can change the decision and warrants its burden, compare feasible interventions, try one within bounds, observe, then decide or stop. Open specification, representation, decision, causal, trial or domain patterns as their questions arise.
- Stop or return: Stop when answered. Return when bearer, relation, constraint, grounding, intervention, or use changes; domain Methods stay in DPF.