Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 22:30:10 UTC

G.0:4.5.1 - Obtain the comparison basis
  1. Recover the decision and its conditions. Use C.39.RQ:4.1 to work backward from what the recipient must decide or explain using this comparison, and forward from what each proposed way can supply. If the decision concerns work done by other people, follow it through to the result those people need. Inspect the request, relevant commitments or rules, and the descriptions of actual use. For each consequential success or failure, ask which property of the subject makes that difference. Recover a binding limit from its applicable requirement or authorized allocation; an observed value establishes performance under its conditions, not the limit the receiver must accept. Where two uses need different conditions, retain distinct scope slices.

    Choose what to compare. An editor asks for help with a publisher’s catalogue index. Find out what the editor must decide. To choose an index for this edition, compare how the entries in each candidate index lead readers to the material they need. To explain the effort spent on past editions, examine the work performed and the resources it used. To recommend a method for later editions, compare what each method can deliver under the conditions those editions allow. When the editor needs several of these results, identify which work produced each index and how the method was used wherever the conclusion relies on those connections. A commission that already establishes the subjects and an applicable comparison rule can proceed directly to comparing them.

    Choose the whole and the model needed for this decision. Start with a decision the receiver could make differently. Keep the properties of the chosen parts fixed and vary their dependencies on other parts or on a larger whole. If the decision changes, include the missing participant or account for its effect at the boundary. Trace the corresponding dependency separately for the system, its method, the performed work or another kind on which the decision relies. Within a fixed whole, ask whether two admissible arrangements look the same in the current model yet call for different actions. Determine what the model must then distinguish.

    Stop when the grounds suffice for the decision and range actually promised. A property of each member, a dependency between members and a property of their joint operation have different grounds. Preserve any shared resource, condition or handover that can change the answer. Distinguish the facts and modelling assumptions from the criterion the receiver wants to test. For a bound on actual behaviour, at least one configuration must fit the evidence and assumptions. A bound that settles the decision throughout that range can suffice. See C.37.MM:4.1.1 for choosing and connecting the ranges.

    Set the feasibility criterion for the Method at the scale being judged. One permitted way of carrying it out that achieves the required result establishes feasibility. To rule out the Method under the stated conditions, show that every way it admits fails, possibly because all need the same missing contribution. B.1.5:4.1 identifies what the whole Method requires and where it allows substitutes. If every successful execution would need a contribution that none of those ways can supply, success of the whole would contradict its own construction. A jointly workable substitute that delivers the required result settles feasibility positively. Separate successes of the constituents still need compatible handovers, resources and operating conditions to establish a way of carrying out the whole. This reasoning applies at each scale where its premises hold. A plan for two jobs describes proposed work. Their number and duration alone do not identify two constituent Methods. To establish that the result is present or was received, use evidence of that result for the subject and time in question. If the commission also specifies a Method, performer or occasion, establish those facts about the execution. An existing report may establish one or more of them. A separately commissioned new execution still has to take place.

    Changing the model changes which conclusions carry over. If every success under the concrete conditions would also count as success in the abstract model, ruling out every abstract success rules out every concrete success. To establish concrete feasibility, justify that at least one admissible execution meets the concrete criterion. The abstract model can admit a combination its concrete counterpart rules out. B.5.MR:4.2 tests a claim of model refinement. For actual operating conditions, one genuinely admissible execution that meets the criterion establishes possibility. To rule out feasibility, cover the ways the practitioner is permitted to obtain the result. Mutually incompatible requirements can settle that question directly. For a guarantee, establish who chooses the actions and what they can know in time. A promise that every permitted execution succeeds covers each such execution. A promise the operator can fulfil by an authorized policy needs one such policy that succeeds under every condition the other parties or the environment may present. G.5:4.4b develops that distinction for selection. If two defensible readings of a record give different answers, resolve the discrepancy or give the conditional answers. If at least one reading is consistent with the evidence and every admissible reading settles the criterion in the same direction, it can be answered with that input still unknown. A supported negative answer can complete an order to determine feasibility. An order to deliver the result or develop an alternative calls for further work.

  2. Turn the differences into characteristics. A.19.ECS:4.2 supplies the construction: start with cases that would satisfy, fail or fall outside the use; identify the properties that distinguish them; split a compound property when its components can vary independently; and establish each characteristic’s subject, meaning, scale, units and observation procedure through G.3/C.16. Existing domain definitions and validated procedures can supply these results directly. If the needed characteristic or procedure is unavailable, the performer entrusted with that construction can develop it if able, or obtain the missing contribution from a competent supplier. Identify the decision it must support.

  3. Choose the comparisons the question needs. For each proposed comparison, state what relation between results would change the receiving decision. Match that relation to the characteristics’ lawful operations: equality of categories, an order where justified, or a numerical operation whose scale, units and assumptions permit it. Retain separate coordinates when trade-offs have not been resolved. A weighted total requires a justified aggregation and the receiving preference basis. G.0 then enumerates this finite set of comparators and its legality conditions.

    Choose what will count once for that decision. A comparison of two procedures on the same jobs and a comparison of the total workloads those procedures would generate answer different questions if either procedure changes which jobs arise. For results from several sources, establish which observations concern the same unit, population and period. Count shared cases as the chosen unit requires. Where matching is incomplete, a bound on the overlap may already settle a threshold. Preserve separate results when the requested comparison still depends on the unknown matches.

  4. Obtain the evidence minima from the claim. Follow each required characteristic and comparator back to what would establish its inputs and applicability: for example, a traceable observation under the relevant operating conditions, an exact proof for a formal claim, or a justified transfer from a different population. Reuse the applicable domain qualification, measurement or acceptance method. Specify the carriers, conditions and checks it requires, and the consequence when they are missing or fail. G.2 can recover missing source support; G.4 carries the acceptance policy. A currentness window is needed when the claim’s use depends on it; a numerical support fold needs its actual model under B.3/C.2.2.

  5. Return the supported frame and its limit. The available material may establish all required criteria, disqualify an operation, or leave a particular criterion, authority, measurement procedure or transfer premise unresolved. Keep those outcomes separate. Identify the source, responsible authority, observation or method construction that could settle an unresolved premise, and which comparison must wait for it. A descriptive comparison can remain useful when a required acceptance judgement is unavailable; it must retain that receiving-use limit.

Worked construction. A team must compare compression methods for a specified archive batch on one host. The available request says “choose a method that fits the backup operation”; the maintenance allocation gives a 15-minute window and a 2 GiB memory allowance, while the archive requirement demands lossless recovery. The batch inventory and host configuration establish the scope. Working backward exposes three required properties: recovery identity, elapsed time and peak memory. Recovery identity is tested by comparing the recovered contents with the original batch; time and memory use the stated measurement procedures and units. The requirements supply the pass limits. Among passing alternatives, an additional request to reduce storage permits comparison by compressed size; without a preference for trading time against size, the frame retains those coordinates separately.

A report that tested recovery on the same batch supplies that observation; a report giving a 12-minute mean on a different host needs a justified transfer or a measurement on the receiving host. That mean does not establish a guarantee of fitting the allocated window. If the receiving requirement is a guaranteed upper bound, the chosen qualification method must supply that bound; otherwise fit remains unestablished. If the allocation is absent, the team can compare observed times and memory but must obtain the applicable allocation before claiming acceptance. If the receiving question changes to archival space efficiency with no execution-window requirement, the performance observations remain usable while the 15-minute gate no longer governs that comparison.

If the same backup requires two nine-minute jobs to finish in fifteen minutes, they must overlap for at least three minutes. Each job peaks at 1.2 GiB. Their peak sum of 2.4 GiB alone leaves fit under the 2 GiB limit open. If each needs 1.2 GiB throughout its run, the necessary overlap cannot fit. If both can use 0.6 GiB during the same three-minute overlap and each fits alone for its remaining six minutes, that schedule fits. This establishes a feasible schedule. A guarantee under other permitted schedules needs grounds covering them.