Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 20:35:15 UTC

LDR.Reference:2 - How the leadership methods and their suppliers connect

The methods address different breaks in the relationship between participants, purposes and joint work. Begin with the result that is still missing.

What the situation leaves unresolvedUseful leadership resultWhere the way is explained
People have concerns or ambitions but cannot yet say what they can undertake together or who will carry the initiative.A direction shaped with the relevant participants, the bounds of their participation and a justified first action or refusal.LDR.5, with strategic or domain construction where needed.
A needed explanation, role conversation, challenge or continuing initiative lacks a capable performer or usable conditions.An agreed arrangement with the means to supply the contribution. For a question about performance, establish who did the work and what reached the receiver.LDR.1.
Parties’ proposed contributions or terms cannot coexist.A feasible whole accepted by those whose agreement is required, or a precise impasse.LDR.2.
An examinable proposal has not reached an effective decision, supported start and useful performance.The authorized first contribution reaches its receiver, with the remaining conditions visible.LDR.4.
A person cannot connect their chosen purpose, actual action and further development.An attainable personal continuation or a reason to change the undertaking.Reference:1.6 connects the choice to STR.5/.6, the complete HCD.2/.15 methods and the actual work conditions.
Participants cannot obtain a justified subject answer.A connected answer with its grounds and limits.FPF B.5.SD and the relevant professional method.

For example, a designer and service staff can begin from unlike accounts of recurring user difficulty. LDR.5 helps them form a common question and undertake its investigation; the domain method supplies the explanation. If the result supports an improvement but the necessary service hours conflict with existing obligations, LDR.2 obtains compatible contributions. If the proposal still needs a permitted first use, LDR.4 obtains the decisions and follows the use. LDR.1 can supply capable help at any of these points. An already warranted and accepted routine action enters directly at its remaining work.

The same evidence can select a different continuation. New findings can defeat the problem interpretation, returning to LDR.5 and the domain inquiry. A sound shared direction with a withdrawn support offer returns to LDR.2. An effective decision followed by an inaccessible tool needs that access restored. Repeating the direction-setting conversation in the latter cases would add no missing contribution.

The connected methods can be used separately. A proposal, agreement, plan, instruction, performed contribution and capability claim remain different things. One performer may supply several methods, while one method can require several performers and working products. FPF C.32.MWA provides the fuller account when that distinction changes the arrangement.