MDPE.7:5.7 - Direct-decision and live-branch stops
Use an existing decision or a suitable direct artistic, rehearsal, teaching, event, curation, operations, strategy or engineering method when it supplies the needed result. Use A.15.7 when conditions change the next action within ongoing work under an identified method.