Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-10-14 19:58:00 UTC · snapshot created 2026-10-14 19:58:38 UTC · last check 2026-10-15 00:05:10 UTC

OCE.Reference:14 - Pattern selection and result relations

Working questionStart or continue withFirst returned resultMain return or continuation
Which organization and contribution are being changed?OCE.1Bounded organization-change focusOCE.2, OCE.3, or the direct owner of a non-OCE question
What Work and relations obtain now?OCE.2Grounded current organization accountOCE.3 or the exact missing evidence/relation owner
Which materially different organization concepts deserve comparison?OCE.3Status-preserving concept set and decisionOCE.4, conditional OCE.5, OCE.7, or OCE.8
Which contribution paths and specialization boundaries should guide design?OCE.4Contribution-architecture decision and possible-future description, including relation specificationsOCE.5, OCE.7, OCE.9 for realization, or the owner of the needed relation
Does a stable institutional position need to exist?OCE.5Position identity and establishment/continuation result, or direct-arrangement returnOCE.6 or the applicable institutional owner
Which assignments and enabling relations obtain?OCE.6Predicate-specific effective relations and exact gapsOCE.9 for realization, ADM.2, or the relation owner
How should product/service and organization architectures constrain each other?OCE.7Separate coordinated decisions across four candidate formsproduct/service owner, OCE.9 for realization, or continuing Operations
Which complete work arrangement can produce the same bounded result?OCE.8Same-result baseline and whole-candidate comparison, followed by an authorized choice or probe, rejection, or reroute; a preliminary result may be a recommendationObtain the needed capability, assignment, provider, safety/domain, or Operations result from its owner. Use OCE.9 to realize missing conditions; dependent trial Work still needs its own authorization.
How can the selected organization contribution become usable?OCE.9Bounded capability increment or exact failed/unrealized conditionOCE.6, OCE.10/OCE.11 and LDR.1, receiving operation or the direct result owner
Which response can repair this participation or working-culture gap?OCE.10Supported response and bounded consequences when performed, or an unresolved competing explanation or gap; no new contrast when the current response is sufficiently supported across rivalsdirect relation/learning owner; OCE.9, OCE.11 or LDR.1 where its result is needed
How can change and continuing service coexist?OCE.11Authorized overlap, observed service/change consequences and hand-back, or deferral/stopcurrent C.32.MWA.PP, OPS.5–OPS.7, OCE.8/OCE.16 or the exact service/protection owner
How can capability preparation lead to actual receiving work in an organizational transition?OCE.18A jointly feasible preparation, receiving-work and continuation arrangement, or its precise missing conditionqualified HCD provider, OCE.6/OCE.9/OCE.11, work/appointment owner
Which leadership contribution is missing or dependent on one initiator?LDR.1Performed contribution and tested continuation arrangement, or exact support gapqualified learning provider, OCE.10/OCE.11, assignment/authority owner or the direct Method owner
What changed, for whom and under which conditions?OCE.13Qualified consequence comparison with conflicting results, competing explanations and gaps, or an observation planOCE.14, OCE.10/OCE.11, or the owner of the needed measurement, evaluation or affected-result judgment
Which organization relation should now be retained, repaired, replaced, reversed, stopped or investigated?OCE.14Authorized disposition with effective scope, losses and remaining work; otherwise a proposal or authority requestOCE.6/OCE.9–OCE.11 and LDR.1, later OCE.13, and OCE.16 only for an actual cross-change consumer
Which organization-change Methods are usable and worth developing?OCE.15Named-use repertoire or domain candidate accountMethod Engineering and the exact missing OCE result owner
Which other separately managed change uses the organizational condition now being altered?OCE.16Qualified cross-change question, direct exit, or specific missing result; then return of the resolved condition to each affected changeC.32.MWA.PP, C.32.MWA, the applicable OCE/OPS/A.15 Method, or the specialist responsible for the needed decision or result
Which OCE practice continues across practitioners and work settings?OCE.17Scoped continuation account, a retained practice variant, permitted intervention, or specific return, with later observation or a named gapOCE.15/Method Engineering for a reusable-Method problem; applicable HCD or direct opportunity, authority and evidence owners

Choose the next pattern from the result needed, not from a presumed lifecycle. OCE.13/OCE.14 can use a direct result without repeating a wider evaluation; OCE.17 can support retaining useful practice without a new intervention.