Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-26 21:07:53 UTC · snapshot created 2026-11-26 21:08:36 UTC · last check 2026-11-29 23:45:10 UTC

SIE.13:4.8 - Keep the result inspectable

The result must let the receiver recover the answer and its allowed use, the relied-on semantic contributions, their operative connections, the realization and interface supplied, and the evidence for the returned disposition. Keep material missing contributions and change conditions visible. The package anatomy locates the supplying results; it need not be duplicated in a new record.

For a small use, links from the returned query rows to a contract, mapping and qualified source material can carry this account. For a larger use, maintained specifications and implementation evidence may be necessary.

For a design commission, identify which parts and relations the engineer chose and the constraints supplied by the contract or source owners. Show why the chosen construction satisfies the intended uses. One feasible construction can meet an order for a design. A claim that it is preferable requires grounds about the alternatives that could affect that choice. A correct answer obtained through an existing mapping can complete an order for one query. To report an actual delivery, establish that the specified material reached the recipient. Connect it to a particular request when the claim concerns the response to that request.