Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-16 21:18:08 UTC · snapshot created 2026-11-16 21:19:40 UTC · last check 2026-11-17 19:45:20 UTC

SIE.13:7 - Conformance Checklist

Recognize this problem when the receiver still cannot obtain an answer from otherwise useful local contributions. Check the claimed answer under the conditions of its intended use. A claim about a deployed service or a change in user performance requires evidence of that service or change.

  • The receiving continuation and its acceptable answer branches are explicit; an adequate supplied contract is reused.
  • Each required answer claim can be followed to its semantic premises and the operations that produce it.
  • For each operation, the input results warrant their use in that operation for the subjects and conditions in question. Correspondence, identity and claim composition have distinct roles.
  • The next missing result is chosen for its effect on the receiving answer, with an obtainable supplier or an explicit blocker.
  • The complete arrangement is compared under relevant shared limits, permissions, trace and failure conditions; local or pairwise feasibility is not substituted for that comparison.
  • The supplied interface preserves the qualified meanings, material absence and conflict branches, and the receiver’s required interpretation.
  • A positive use claim has evidence for every load-bearing premise and joint condition within its scope. A negative conclusion states the obligation it defeats and the reach left unexamined.
  • A partial answer is permitted by the contract and retains its own required premises. A changed premise reopens its dependent contributions and uses while adequate unaffected results remain reusable.
  • The result returns to the receiving owner without claiming that semantic integration grants downstream decision authority.