SYSE.18:4.1.1 - Find the condition that breaks the shared use

Start at the required result and work backward to its necessary contributions, then follow a concrete occurrence forward. At an interface, identify the supplying and receiving Systems, what passes between them, and the condition that makes it usable. For a timed contribution, distinguish when it is produced, received, acted on and needed. Compatible message formats can still carry a late, stale or inapplicable result.

Compare needs and provision on the same basis. A receiving operation may need six hours after notice while its provider promises four hours before an outage. Could the provider give earlier notice, could the receiver respond sooner, or could another arrangement cover the two-hour gap? Those proposals alter different contributions and require different decisions. The provider’s commitment is its duty to give notice on the agreed terms. Evidence of response capability or performance supports the separate claim about what response can be relied on under those conditions.

Include a constituent’s competing uses when they consume the same capacity or determine its availability. Two individually sufficient offers may be incompatible when they reserve the same resource at the same time. Use SYSE.13 for configuration correspondence, SYSE.9 for a needed specialist result and SYSE.20 when the issue is joint Work or resource use. Retain a compatible supplied result rather than repeating its production. If the necessary condition cannot be established, carry that precise dependency into the comparison.