Jump to text
On this page
Copy and source
Published source confirmed at last check

Source changed 2026-11-22 20:50:18 UTC · snapshot created 2026-11-22 20:55:26 UTC · last check 2026-11-22 22:10:10 UTC

SYSE.19:4.1.5 - Choose and perform an available continuation

First compare what the present evidence already permits with what the project needs. A narrower operating range can answer the question only if its receiving use remains worthwhile and its conditions can be met. A proposed restriction that no operator or control can enforce is not an available continuation.

For additional work, identify the performers, capability, equipment, specimens, access and authority that make the proposed result obtainable. Include preparation, coordination, execution, interpretation, delivery and displaced work in the burden. Check joint use of a laboratory or specialist across the selected activities; individually timely estimates do not establish a timely programme. Select work when an attainable outcome can change the decision or meet a necessary evidence condition within the relevant horizon. Keep a delay or stop when no available option supports the required use. Cost cannot turn a missing premise into evidence.

Give each performer the claim, configuration and conditions needing support, and the contribution expected from that work. Before relying on the return, establish what Method, configuration and conditions were actually used and what the observations and limits were. A changed instrument, specimen or procedure may reopen only the inferences that depended on it. Use SYSE.10 to qualify the evidence. The authorized Agent makes the engineering decision and any required release permission has its own basis.