SYSE.3:5.2 - Manufacturer’s ERP-enabled planning change
The architecture candidate concerns one deployed production-planning System. It names the software bearer, interfaces to order and shop-floor Systems, selected data and decision relations, and the planning functions that those Systems are expected to support.
The first unsupported branch is the change from current product, order, and resource descriptions to the
configuration and integration state required by the candidate. PlanningIntegrationTeam-2 is the candidate
transformer System for RepresentativePlanningDataIntegrationWork-1: mapping one representative data family
and configuring its source-to-planning interface. The planned holder-dependent capability requirement is the
ability of that team to apply BoundedPlanningDataMappingMethod-v1 under the actual source semantics, access,
timing, and configuration conditions. This is WorkPlan content until A.2.2 supplies a current capability
result and A.2.1 supplies an assignment occurrence when one is needed.
MigrationToolService-3 is a separate proposed tool or service contribution to that Work: access to a named
mapping-execution interface under the selected configuration. This case attributes no transformer assignment
or data-mapping capability to that service label. If a later claim relies on it as an acting System, the
engineer applies System recognition before making separate claims about its role, capability, and Work. The
immediate WorkPlan item names PlanningIntegrationTeam-2 as intended performer of the representative-slice
feasibility investigation and asks for RepresentativeIntegrationFeasibilityAccount-1 plus any organization-
design result needed to make the slice feasible.
If the gap concerns who may change source definitions, which organization holds an assignment, or which
authority relation applies, the engineer obtains that result from Organization Engineering or Governance
rather than encoding it as a technical interface. If the branch cannot preserve the required decision timing
or data meaning, the engineer reopens the C.32 comparison of interface, placement, and responsibility
structures. The engineer reassesses the linked planning concept under SYSE.2 only when the planning-use claim must change. The words platform and migration pipeline establish
neither integration capability nor one universal Work order.