Library / First Principles Framework (FPF) - Core Conceptual Specification
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 02:22:15 UTC · snapshot created 2026-10-03 03:38:22 UTC · last check 2026-10-03 03:40:20 UTC

A.11.OP:8 - Common Anti-Patterns and How to Avoid Them

Anti-patternWhat failsRepair
Fewest steps winsDeterministic realization, exploration, assurance, or recovery is deleted because it adds work.Apply all three branches and compare substantive consequences, not step count.
Next-click horizonA probe is judged useless because it changes a later decision rather than the next administrative action.End the horizon at the nearest named substantive receiver and state the dependency.
Infinite downstream usefulnessAny requirement survives because it might help an unnamed future user.Require a named receiver, decision, reliance, or recovery use; otherwise remove or demote it.
Administrative self-receiverA receipt is justified because it updates the route state that exists only to carry the receipt.Name a subject decision or reliance outside the requirement’s own administration.
Fabricated alternatives for deterministic workA build or transformation step must invent outcome branches to look decision-relevant.Retain it through selected realization when it performs the already selected result.
Precaution label as assuranceCalling a step “safety” or “compliance” creates an unsupported floor.Name the direct authority, evidence, exposure, and relied-on condition; return their disposition to the direct owner.
Possible contribution as sufficient reason to require workA probe is demanded because it could matter, despite unavailable means, excessive burden or a missed receiving window.Establish contribution here; complete the live demand or choice question through C.11.DUA or C.11 and retain a useful current answer when acquisition is not selected.
Mandatory parsimony recordThe screen creates the same ceremony it is meant to remove.Use one ordinary disposition sentence unless a named later use needs a durable episteme.
Free-energy or physics launderingExpected free energy, variational free energy, or Hamiltonian least action is presented as proof of a universal engineering rule.Keep only the bounded epistemic, pragmatic, horizon, and risk distinctions; reject mathematical equivalence and mandated scalarization.