Library / First Principles Framework (FPF) - Core Conceptual Specification
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 02:22:15 UTC · snapshot created 2026-10-03 03:38:22 UTC · last check 2026-10-03 04:10:10 UTC

A.15.1:15a - P2W Performed-Work Use Relation

When E.18.1 reaches performed Work, first recover each actual performer System’s A.13 local kind and criterion, classification, obtaining assignment, scope, working situation, and window, with evidence adequate for those core claims and a characteristic profile only when conditionally consumed. Then identify the exact candidate action, Method actually followed, extent, and at least one obtaining locally declared containing-System relation, and admit one Work individual under U.Work. Only after admission, if precise assignment-bound attribution is current, use F.6 to relate that Work to the same assignment. Add only the actual operation binding, resource use, or Work-to-referent relation on which the receiving sentence relies. Planning may name intended performer conditions but does not backdate an A.13 assignment, agency claim, or Work occurrence. A Work occurrence may be designated by an episteme that also cites a U.WorkPlan, exact A.15.3 planned-filling claim, or prior readiness claim as a baseline. For an operation argument or result, cite one identified A.6.1 application and its exact binding. For another participant, premise, resource use, or work-to-referent claim, name the declared predicate, participant order, and actual values; if that predicate is absent, return the corresponding missing-governor result. Do not copy a result or consequence into Work; follow the concrete §4.6 route.