A.15.1:4.4 - Publication-use boundary for U.Work
A publication about one Work occurrence projects an already declared assertion or description episteme; it does not create the world-side occurrence, add performed-occurrence facts, or make a plan, source reconstruction, dashboard, publication face, or carrier count as performed work.
Preparation is classifiable as one Work individual under U.Work only after it actually occurs and its performer’s A.13 basis, at least one enacted Method, temporal extent, and at least one obtaining locally declared Work-to-System containment relation are independently grounded. After that admission, establish the covering assignment’s F.6 attribution separately only when the receiving preparation claim needs precise assignment-bound performer attribution. Add a Work-to-referent, binding, or resource-use fact only through its own obtaining relation when the receiving claim needs it. WorkEntryReadiness@Context under A.15.5 asks whether intended Work is ready to enter a Work boundary; a readiness label, full-kit checklist, or launch-looking cue is not a performed occurrence.
| Publication-use pressure | Work-local rule |
|---|---|
| PlainView, TechCard, InteropCard, or AssuranceLane presents work material | Project only the work-occurrence references needed by that view: temporal extent, actual performer System and its A.13 basis, enacted Method, and at least one obtaining local containing-system relation, plus the assignment and F.6 attribution when the receiving claim uses their identity, and any separately established binding, resource-use, or Work-to-referent relation on which the view relies. Project a neighboring result, change, production, delivery, evidence, or judgment only through its matching §4.6 row; do not add a consequence field to Work. |
| numeric, comparable, aggregation, or benchmark content appears | Pin the comparator, aggregation policy, CG-Spec, reference plane, and transport edition needed by the claimed comparison; do not hide scalarization in the publication face. |
| publication cites method-description, work-plan, or cross-context material | Keep the Work occurrence as the dated performed individual admitted under U.Work. Cite the exact selected method-description or work-plan episteme. For a semantic crossing, cite an obtaining F.9 Bridge between two exact SchemeSenseCell values and state the proposed action, direction, correspondence rule, and tolerated loss in a separate bounded-use claim. Cite a UTS, reference-plane, or edition relation only when its own predicate obtains. |
| reconstructed records look like a performed occurrence | Do not synthesize a surrogate Work occurrence; a publication may cite only Work individuals that meet the occurrence basis in this pattern. |