Library / First Principles Framework (FPF) - Core Conceptual Specification
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 11:52:20 UTC · snapshot created 2026-10-03 11:53:41 UTC · last check 2026-10-03 12:10:10 UTC

A.15.1:5.3a - Before A Timetable Becomes Architecture Evidence

A timetable, workflow row, or architecture table can help locate candidate Work. It does not establish a Work occurrence, whole, part, overlap, or order. Before relying on such rows in an architecture decision:

  1. identify each Work occurrence from every actual performer’s A.13 basis, independently grounded performance history, enacted Method, actual interval, and an obtaining relation to a containing System; when precise assignment-bound attribution is current, apply F.6 separately after admission;
  2. if several rows are claimed as parts of one Work whole, identify that whole and every part independently, then state the exact Work-part relation that holds;
  3. if two occurrences are claimed to overlap or follow one another, state their actual intervals and the exact C.27.TA temporal relation; and
  4. state coordination, participation, resource use, result, or acceptance only through its own obtaining relation when the architecture decision needs it.

Two activities with similar names or one planned time window can still be distinct Work, and a schedule row may remain only plan content. If the actual occurrence or required relation is missing, preserve the plan, description, interval, or separately grounded Work that is available and stop the stronger architecture claim.