A.15.2:9 - Launch-value and actual-use boundary for P2W
For P2W use, U.WorkPlan may state intended performer Systems and local system-role-kind conditions, planned values, exact A.15.3 fillings, constraints, reservations, commitments, and evidence-reference notes. A.15.5 may later publish one C.2.1 work-entry readiness result whose exact EntityOfConcern is this WorkPlan; its ClaimGraph may designate the relevant declaration-local PlanItem content used by the readiness criterion. An A.21 GateDecision separately selects, narrows, blocks, or passes its declared crossing under one current GateProfile. Neither result institutes permission.
When the entry criterion consumes permission material, keep the current A.2.8.PER values distinct. A GrantedPermissionRelation@Context occurrence is strong permission only for its exact beneficiary, action specification, U.ClaimScope, and validityWindow. A NonProhibitionFinding@Context reports only its frame-relative result for its evaluationWindow; it is not a grant. A PermissionNormConflictFinding@Context exposes overlap for its overlapWindow, and a current resolution result is usable only when the A.2.8.PER resolution predicate obtains and the result names its effectiveWindow; an unresolved conflict stops or degrades the proposed use. PermissionExerciseRelation@Context and NonViolationFinding@Context require already dated actual Work and therefore cannot be prospective proof that the intended performance may start. When the governing entry policy requires a grant, absence or unavailability of that exact current grant permits no authorization claim; readiness, gate passage, or non-prohibition cannot stand in for it. The WorkPlan, readiness result, gate decision, permission values, and their windows make no planned value actual and create no Work occurrence.
At performed-work entry, identify one exact Work occurrence as an individual admitted under U.Work by A.15.1. For an actual relation participant or another world-side value, name the direct relation and its obtaining predicate. For an operation argument or returned result, use A.6.1 only after the exact application and its declaration-local binding predicate obtain. Keep the gate decision, plan claim, readiness result, permission facts, Work occurrence, actual-use relation, provenance, change, result episteme, production, delivery, acceptance, and downstream effect separate.