Library / First Principles Framework (FPF) - Core Conceptual Specification
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 17:24:51 UTC · snapshot created 2026-10-03 17:30:20 UTC · last check 2026-10-03 18:00:10 UTC

A.15.3:12a - P2W planned-filling use

When P2W reaches intended work and a planned value reuses a declaration member admitted by 4.1, carry the WorkPlan, intended-performance designator, declaration edition, member designator, defining pattern, planned value, and each condition or pin whose change would alter the effective planned value or later comparison. The declaration pattern defines the member and actual-use rule; A.15.2 and A.15.3 state the intention. P2W creates neither the declaration, plan claim, participant, nor application binding.

If no reusable member is needed, carry ordinary A.15.2 plan content. If typed planned use is needed but the member, its meaning, its actual-use predicate, or its defining pattern is absent, carry missing-governor for that intended use. For an incomplete or unresolved plan, name the planning information to recover (§12b). A planned-filling row does not carry performed work, readiness, evidence, gate, result, measurement, publication, delivery, acceptance, exclusion, or completeness claims. Preserve each separately—for example, A.15.1 identifies performed Work and A.15.5 decides work-entry readiness.