Library / First Principles Framework (FPF) - Core Conceptual Specification
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 02:22:15 UTC · snapshot created 2026-10-03 03:38:22 UTC · last check 2026-10-03 04:15:10 UTC

A.15.5:5.2 - Documentation Repair Probe

Situation: an assisting agent can run a reversible documentation probe to find source-currentness gaps.

For the probe itself, apply one exact readiness criterion to its WorkPlan, using the designated declaration-local PlanItem content that the criterion needs, and return the local readiness value with its relied-on inputs, window, and recheck condition. If the probe is actually run, first recover the precise performer System’s A.13 core for that action and independently admit the dated occurrence as U.Work under A.15.1 from its performance history, enacted Method, extent, and containing-System relation. Add F.6 afterward only when the target repair-readiness account also consumes precise assignment-bound attribution through the same obtaining A.13 assignment; otherwise leave F.6 unopened. Then run a separate readiness check for the target repair. The claims about the probe plan, probe readiness result, performed probe, and target-repair readiness result are four distinct claims.