A.15.6:4.1a - Connect project work to its project system-of-interest and network question
Start with an ordinary sentence: this project work is intended to change, produce, restore, evaluate, or prepare the use of this system. Then name the composite project U.Work, the system or intended-system designator, the plan or decision that selected it, the concrete change or use being pursued, and the next decision that needs the designation.
The primary expression is project system-of-interest, inherited from systems engineering without adding target, aim, or goal semantics. systemOfConcern may be used as a historical Plain synonym. Neither expression admits a System, system-role kind, assignment, relation, or project kind.
When the designated system already exists, identify that same entity under its admitted U.System kind. The plan or decision may say why it matters to the project, but that designation does not put the system inside a project container. Actual links still come from relations that obtain: a work-to-referent or work-to-change relation, one independently identified Transformation, a branch-local A.15.PROD production or inception claim, an evaluation, a participation or use relation, or another separately defined direct relation. Include only links used by the named decision.
When the System is only intended, keep its designator and expected change or use inside the U.WorkPlan, decision, System description, or other claim episteme. Before its identity rule first holds, there is no future U.System, system-role-assignment holder, or Transformation of that not-yet-existing System. A.15.PROD may later state the identity-inception boundary. After inception, relate the actual System to the earlier description through the applicable reference or identity claim, then test project designation, participation, local system-role classification, and any assignment at their own times.
Project designation, local system-role classification, and system-role assignment do not entail one another. Classify an actual System under SystemOfInterestSystemRole only after A.2 identifies that local kind and its feature criterion and the System satisfies it. When assignment identity or its window matters, A.2.1 names an occurrence with the System as holder and its declared U.SystemRoleAssignment species. That species declares SystemOfInterestSystemRoleKindDomain for the assigned-kind position; the occurrence supplies SystemOfInterestSystemRole as a value from that domain. Designation, passive affectedness, or a familiar label establishes neither classification nor assignment; an assignment does not prove project designation. A patient record, damage claim, measurement result, or other non-System case subject can remain central to project Work but cannot be classified under that system-role kind or hold such an assignment.
When one project question spans operation or use of the project system-of-interest together with production, identity inception, later change, verification, feedback, or recursive builder questions, E.18.NET may select the relevant independently identified TFS or nested-network members. The selection must pass its four A.22 discriminators: direct members, obtaining cross-member relation occurrences, applied constraints, and one networkUseFrame; all endpoint bindings must resolve. If a member or relation is ungrounded, keep a Plain proposed network explanation and name the missing member, governor, false or unresolved predicate, occurrence, or binding. The selected network is a non-agentive U.Structure, not the project, performed Work, a case, or evidence of work parthood.
If the network-selection judgment must persist, use one ordinary C.2.1 result episteme whose EntityOfConcern is the selected network and whose claim says only why it answers the named project question for the stated basis and qualification window. Project Work, transformations, case closure, production, evidence, and decisions remain separate subjects and claims. A record creates none of them and creates no projectHasNetwork relation.
Use the lightest claim that answers the project-selection question. A plan or decision designation and every independently obtaining Work, change, production, evaluation, delivery, acceptance, or use fact remain usable. Often the ordinary sentence “this plan designates PumpUnit-3 as the system this upgrade is about” is already the whole needed claim; do not construct a conjunction around it.
For one bounded decision that genuinely needs the combined truth, a C.2.1 local compound claim may cite the named plan or decision, composite Work, actual System, direct facts, applicability, and case facts. Its constructor semantics must be recoverable, but A.6.RCD does not require a separately materialized substrate document for a simple one-case claim. Name and pin the substrate when the derivation is nontrivial, intended for interoperability, used as proof, or reused. Repeated parameterized use may justify a reusable predicate-definition episteme. Admit a relation kind only when a named receiver also needs distinguishable project-selection occurrences with their own identity.
Return missing-substrate[project-selection-conjunction] only when the stronger compound claim is needed and no current substrate supplies the proposed operator semantics. The blocker stops that compound claim; it does not invalidate the plan designation or any direct fact.
For PumpUnit-3, the plan and upgrade decision directly designate the pump, while the admitted composite Work, Work parts, and pump-change facts remain supported independently by their defining patterns and facts. That is enough for ordinary project attention. Open a compound local claim only for a decision that consumes the conjunction, and materialize or pin its substrate only under the conditions above.