Library / First Principles Framework (FPF) - Core Conceptual Specification
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 05:29:54 UTC · snapshot created 2026-10-03 05:30:57 UTC · last check 2026-10-03 06:00:20 UTC

A.15.6:7 - Conformance Checklist

  1. Start with section 4.0: read the claim and name the subject it actually concerns rather than interpreting the management label as a kind.
  2. For an actual project, apply A.15.1 to the composite U.Work, then the five project qualifications in section 4.1. Planning material remains content of its U.WorkPlan until Work occurs.
  3. Use obtaining Work-part relations and A.15.1 continuity rules; a time interval, team, charter, repository, policy, or label establishes neither parthood nor continuity.
  4. For a process concern, choose among U.Method, an A.22-selected U.Structure, and TransformationFlowStructure as section 4.2 states. Before using Work as evidence, use A.15.1 to state which Method the Work enacts, or identify the A.6.1 application and bindings that support the claim.
  5. Preserve multi-object evidence until the current use selects a grouping, query, or constraint. Record what a flattening omits; do not identify its result with a Method, Work occurrence, or case subject.
  6. For a case concern, name the subject or claim, the references used by closure, the closure basis, and the downstream use that remains outside. Keep the case record as a separate episteme.
  7. Recover each description’s claim content, EntityOfConcern, and effective scheme under C.2.1. Treat notation readability or simulation support as a representation-use question, not as subject identity, claim truth, case closure, or performed Work.
  8. Keep project system-of-interest designation, System identity, local system-role classification, and any assignment occurrence separate in every direction. Do not backdate a future System.
  9. Use section 4.1a for a project-selection account. A direct designation may answer the ordinary case; a stronger compound claim needs recoverable constructor semantics, and missing-substrate blocks only that stronger claim.
  10. Keep performer, Work, change, result, success, acceptance, evidence, decision, description, publication, and later use as separate claims. Apply the pattern that defines or tests the current relation.
  11. For result wording, name the referent and say what it is a result of or for; then use the applicable A.6.P.WMR outcome. Whole-project aggregation also needs its Work-part basis and relation-and-measure policy.
  12. Use E.18.NET only for independently identified transformation-flow structures connected by obtaining cross-boundary relation occurrences. The network is not the project, an actor, performed Work, or evidence of Work parthood.
  13. For a Transformation, first identify the actual bounded change and continuing referent. Add an actor-side or Work-realization claim only when its own predicate and facts establish it.
  14. Reuse of one Method or transformation-flow structure elsewhere has its own enactment or selection facts and creates neither cross-project Work parthood nor cross-case identity.
  15. A changed source or direct FPF dependency reopens only the affected rule and nearest case named in section 11.