Library / First Principles Framework (FPF) - Core Conceptual Specification
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 10:39:28 UTC · snapshot created 2026-10-03 10:40:04 UTC · last check 2026-10-03 10:45:12 UTC

A.15.7:12 - Relations

  • Builds on: A.3.1 for domain and steering Method identity; A.13 for each actual performer; A.15.1 for independently admitted current Work and each separately obtaining enactment; F.6 when the result must also identify the assignment under which that Work was performed; and A.10 for source/currentness reliance when it changes the action.
  • Coordinates with: A.15 for SystemRole–Method–Work alignment before next-action selection; A.15.6 for recovery of the direct subject from project, process, or case wording before live Work steering; A.15.2 for intended-work content and a separate WorkPlan change; A.15.5 for work-entry readiness; B.1.5 for admitted Method composition; C.11 for comparison among a current OptionSet; A.19 only for a current comparison or selector result; C.18 only for an actual open-ended candidate archive/front; C.24 for tool-call planning after the action is fixed; and G.11 for scoped refresh.
  • Keeps separate: chooser, intended performer, authority, capability, MethodDescription, plan, recommendation, performed action, result, and later Method or description change.