Source changed 2026-10-03 05:29:54 UTC · snapshot created 2026-10-03 05:30:57 UTC · last check 2026-10-03 07:10:10 UTC
A.15.7:7 - Conformance Checklist
CC-A15.7-1 — Current Work. Is ongoing Work identified, or did the user correctly stop and name A.15.2, A.15.5, or C.11 for the question that remains?
CC-A15.7-2 — Method limits. Is the applicable domain Method and the relevant allowance or stop explicit?
CC-A15.7-3 — Action-guiding information. Does every stated fact matter to the action, and is the observation, report, recommendation, or other information current enough when that matters?
CC-A15.7-4 — Method relation. Are domain and steering Methods distinct, with co-enactment or composition asserted only from its own basis?
CC-A15.7-5 — Available actions. Are mandatory action, recognition, comparison, generation, and tool-planning branches kept separate?
CC-A15.7-6 — Chooser and performer. Are the deciding System, intended performer, and any authority or capability claim stated separately?
CC-A15.7-7 — First result. Does the answer visibly state the decision, performer, and stop or feedback condition?
CC-A15.7-8 — No backdating. Are later observations, plan changes, performed actions, and Method changes identified separately rather than written back into earlier Work?
CC-A15.7-9 — Plain use. Can a cold practitioner understand what to do before meeting the formal distinctions?