A.15.PROD:5.5 - PumpSkid assembly before PumpSkid identity
Actual Work and change. Mounting, wiring, fluid-connection, and whole-configuration changes may each be independently identified under A.3.4, and exact work parts may be grounded under A.15.1.
Inception basis. A PumpSkid inception claim may proceed only when a named applicability predicate or filled local claim applies the exact PumpSkid identity-specification episteme to the candidate configuration and boundary. Named Work-to-change and change-to-identity predicates must also obtain for the actual participants and case facts. A missing applicability or link returns its exact blocker.
Transformation-composition boundary. A claim that additionally requires positive composite-transformation identity or transformation parthood stops at missing-governor[transformation-composition]. Work or method decomposition supplies no proof of transformation decomposition.