Library / First Principles Framework (FPF) - Core Conceptual Specification
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 11:52:20 UTC · snapshot created 2026-10-03 11:53:41 UTC · last check 2026-10-03 12:20:10 UTC

A.15:12c - P2W Work-Family Split

When an E.18.1 P2W use reaches work planning or work-entry readiness, keep the selected Method, one U.WorkPlan with any declaration-local SlotFillingsPlanItem content, WorkEntryReadiness@Context, dated Work occurrence, and separate result records distinct. A planned-filling row is addressable only through that WorkPlan and gains no independent identity. A principle scheme, functional diagram, or scenario may guide Method inspection and planning only after the current work-family value is named.

Work planning may cite evidence and currentness requests for the direct relation under repair. A.15.5 may cite the exact WorkPlan and designate declaration-local PlanItem content when its readiness criterion uses that content. Name evidence, gate passage, performed Work, result measurement, assurance, or refresh before relying on a planning or readiness record for that stronger claim.