A.15:4.4a - Inspecting Method–Work Alignment Across an Unfolding Structure
Do not create a linkage record merely because one unfolding structure mentions several Method- and Work-related values. Keep each direct relation under the pattern that defines it. When a receiving use must preserve an inspectable explanation across those relations, write one bounded C.2.1 episteme whose EntityOfConcern is the exact selected unfolding U.Structure. Its ClaimGraph may cite, as separate claims, the selected Method and Method-relation structure, MethodDescription epistemes, relevant local system-role kinds and assignment occurrences, the Work that enacts the Method, Work-part relations, independently identified transformations and their direct Work-to-change claims, intended WorkPlans, readiness results, capability-fit conditions, evidence, assurance, and gate decisions. Include only claims needed by that receiving use.
Call this episteme a Method–Work alignment account in ordinary prose. Its identity comes from its EntityOfConcern, ClaimGraph, and effective ReferenceScheme, not from a field bundle. Each claim in the account remains defined or tested by its own pattern: A.3.1 for Method, A.3.2 for MethodDescription, A.15.2 for planning, A.15.5 for readiness, A.15.1 for dated Work and Work relations, A.10 for evidence, B.3 for assurance, A.20 for internal-constraint results, and A.21 for gate decisions. If the useful account would need several unrelated entities of concern, split it instead of using one umbrella record.
Another structure, such as CGUS, P2W, P2S, an improvement-loop slice, or a transformation-flow slice, may cite the exact episteme only when its receiving use needs this alignment explanation. The citation creates none of the cited relations and cannot replace their sources, currentness checks, or criteria.