Library / First Principles Framework (FPF) - Core Conceptual Specification
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 05:29:54 UTC · snapshot created 2026-10-03 05:30:57 UTC · last check 2026-10-03 06:15:20 UTC

A.15:5.1.b - P2W principle-scheme publication guides planning, not occurrence

Source set. A team has a principle scheme that shows an E.18.1 P2W carry-through structure for a fabrication task: signature or principle episteme, method-family selection, selected method, U.WorkPlan, an actual Work occurrence admitted under U.Work, a separate work-result record, and result measurement.

Published slice. For this batch family, method M-2 is selected from the declared method family; prepare work plan WP-17 before any actual Work occurrence exists.

This publication may guide method inspection and work-planning preparation under A.15. A conforming use keeps selected method, U.WorkPlan, actual dated Work occurrence, separate assertion or record about it, work-result record, and result measurement distinct. If the publication is used for evidence, provenance, engineering justification, gate or constraint decision, physical medium, screen, export, OCR behavior, or publication-use, use the pattern that defines or tests that claim. If no project-side kind and reference named by value exists, create only an A.15.4 repair request, decision-request record for the next decision, prospective work-plan entry, or explicit missing-source-relation note.