Library / First Principles Framework (FPF) - Core Conceptual Specification
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 14:36:52 UTC · snapshot created 2026-10-03 14:38:14 UTC · last check 2026-10-03 15:25:20 UTC

A.19.CHR:4.6 - P2W hook: planned edition and reference baseline

For each P2W path that uses the suite, record the chosen suite and member declaration editions, CN-Spec and CG-Spec, method/comparator references, time selection, and applicable guard or crossing references in A.15.2 WorkPlan content. That baseline selects the contracts expected by the protocol and remains separate from actual values and gate decisions.

When a downstream claim needs a typed planned filling, apply §4.1.2 and A.15.3 to the independently declared argument or relation position. At enactment, identify the actual application and its bindings under the selected declaration. The planned baseline alone establishes neither binding nor performed Work.