Link to current text
A.19.CHR:9 - Consequences
| Consequence | Upside | Cost / risk | Mitigation |
| Shared CHR contracts across uses | A later comparison can recover the same member declarations and joint conditions | Resolving the declarations and their editions takes effort | Reuse the baseline while its contracts and intended use remain applicable; keep method-specific choices in their governing descriptions |
| Explicit P2W planned baseline | Eliminates hidden slot filling and improves auditability of editions, time selectors, and crossings | Adds a planning plan item per path slice | Keep the plan item minimal (refs and pins only) and project it to views for readability when needed |
| Tri-state guard semantics | Avoids false precision and prevents unknown from silently passing | More conservative behavior can yield larger selected sets or more abstentions | Use explicit SoS‑LOG degrade branches for probe-only exploration while preserving traceability |
| Spec pins, not copied spec content | Reduces drift and keeps CN‑Spec/CG‑Spec as real centers of gravity | Requires discipline in authoring and review | Enforce “refs-only” at suite/plan level and use conformance items CC‑A67CHR‑3 and CC‑A67CHR‑13 to keep the surface clean |