Library / First Principles Framework (FPF) - Core Conceptual Specification
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 05:29:54 UTC · snapshot created 2026-10-03 05:30:57 UTC · last check 2026-10-03 07:10:10 UTC

A.20:7.1 - Extensions only when another use is current

TriggerAdditional checkDirect pattern
A gate consumes the resultKeep every applicable GateFit result independently recoverable; an A.20 failure changes only the A.21 aggregate under its current rule (CC-A20-5). A deferred required check remains notRun (CC-A20-6).A.21
The exact proposition in an A.6.4 bounded-use assertion q is the named internal constraintApply A.20 to that proposition for the stated case and return only its ConstraintValidityResult; keep r, q, any operation application, and the A.6.4 current-case judgement separate. A Bridge or reversibility claim enters only when separately current (CC-A20-8).A.6.4; add F.9 only for a separate semantic-correspondence claim
Publication, structure, time, refresh, evidence, assurance, or Work is currentKeep those claims in their own result or relation and follow the direct pattern (CC-A20-9). A.20 adds no publication-face, path, slice, scheduler, gate-profile, or gate-algebra fields (CC-A20-7).E.17, E.18, C.27, G.11, A.10, B.3, or A.15, as applicable