Library / First Principles Framework (FPF) - Core Conceptual Specification
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 11:52:20 UTC · snapshot created 2026-10-03 11:53:41 UTC · last check 2026-10-03 14:35:13 UTC

A.21:5.1 - Ordinary local pass

The workshop case at the entry uses two required checks. Each application names its subject and criterion: CalibrationCertificate-44 for TorqueWrench-12 is current under CalibrationRule-E3, and WorkshopEnclosure-2 is closed under EnclosureRule-E2. WorkshopEntryProfile-E5 maps both satisfied results to pass. Worst-result aggregation gives pass; the short rationale names both results, and the bounded action is “start CalibrationCycle-17 before 16:00”. No publication or replay record is required.