Library / First Principles Framework (FPF) - Core Conceptual Specification
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 17:24:51 UTC · snapshot created 2026-10-03 17:30:20 UTC · last check 2026-10-03 18:05:19 UTC

A.6.3.RT.OE:7 - Conformance Checklist

  • CC-RT.OE-1 - Working operation. The expression is prepared for a stated operation and useful result.
  • CC-RT.OE-2 - Source and interpretation. The participating content and selected conventions can be recovered.
  • CC-RT.OE-3 - Shared parts and scope. Identity, grouping, binding and references preserve the relations used by the operation.
  • CC-RT.OE-4 - Meaning-bearing arrangement. Position, order and timing have the interpretation required by the use.
  • CC-RT.OE-5 - Executable use. The intended operation can be followed, or the missing contribution and its consequence are identified.
  • CC-RT.OE-6 - Result status. A newly obtained subject result retains its construction or argument.
  • CC-RT.OE-7 - Useful return. The expression and necessary qualifications support the next use.