| Same-regime wording only | Use A.6.3.CR. |
| Reader-useful ordering into a narrative path | Use A.6.3.NAR; keep RT only for a remaining material scheme shift. |
| Explanation adequacy of an existing face | Use E.17.EFP. |
| Receiving episteme has an independently identified different exact EntityOfConcern | Use A.6.4 for the retargeting arrow, its separate C.2.1 bounded-use assertion, and the current-case judgement satisfies, fails, or cannot decide. |
| Changed kind, ontology frame, predicate set, mathematical domain, or notation without an established EntityOfConcern change | Repeat the C.2.1 identity test and use the exact ontology pattern for any changed claim. Stay in RT when the same EntityOfConcern remains current and representation is the primary change. |
| Same-signal time/frequency or another mathematical representation change | Stay in RT when the same EntityOfConcern remains current and representation is the primary change. Add C.29 only when the use depends on a contested or claim-bearing mathematical lens. A.6.4 opens only after C.2.1 independently identifies a different receiving entity. |
| Carrier rendering, export or serialization of a chosen representation; OCR or parsing that extracts carrier content without yet constituting a receiving episteme | Use A.7 or the corresponding carrier/extraction pattern. |
| A narrower-use coarsened receiving episteme | Use A.6.3.CSC with explicit loss and source return. |
| Cross-context equivalence, substitution, or Bridge use | Keep RT for the representation delta. Use F.9 to test a Bridge between two exact F.17 SchemeSenseCell values from different semantic contexts; cite the Bridge only if it obtains, and keep any C.2.1 bounded-use claim separate. |
| Bounded comparison over already available source epistemes | Use E.17.ID.CR; keep RT only for a remaining material representation change. |
| Problem formulation or abductive prompt, candidate, or selection | Use B.5.2.0 for the prompt and B.5.2 for the abductive loop. |
| Performed Work, a work plan, or authority to act | Use the applicable A.15 pattern for performed Work or a work plan. For an authority-looking claim, select the matching A.6 A6-AW-* row and its direct subject pattern. An RT note or construction supplies neither the Work nor the plan and grants no authority to act. |
| Evidence or assurance force | Keep RT for preservation/loss and use A.10 or B.3 for that exact claim. |
| Temporal or dynamics claim | Use C.27 or A.3.3 for the claim actually made. |
| Transformation-flow graph/path, step-validity, or gate-decision claim | Use E.18, A.20, or A.21 respectively. |
| A contested mathematical lens | Keep RT for the representation transition and use C.29 only for adequacy of that lens. |