Library / First Principles Framework (FPF) - Core Conceptual Specification
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 08:25:59 UTC · snapshot created 2026-10-03 08:26:43 UTC · last check 2026-10-03 09:05:10 UTC

A.6.B:8.4.5.4 - Filled permission case (each sentence classified)

E-CAL-01 (Instituting communicative Work). Admitted system MaintenanceCoordinator-A performed dated CalibrationGrantAct-17 : U.SpeechAct under MaintenanceCoordinator-A@DayShift; that obtaining assignment has the system as holder and covers the act. In this filled case, CalibrationGrantPolicy-v4 does not require a separate authority relation, so none is asserted. The assignment supplies no authority and performs no act. CalibrationGrantAct-17 satisfies the policy in PlantCalibrationContext and is the actual instituting Work. A policy variant that does require grant authority must cite one exact obtaining authority relation under its direct predicate or stop at missing-governor[grant authority].

D-CAL-01 (Grant position). MaintenanceCalibrationGrant-17 : GrantedPermissionRelation@Context, instituted by CalibrationGrantAct-17—the actual speech act stated in E-CAL-01—permits beneficiary MaintenanceTechnicianSystemRole to run CalibrationProcedure-v3 in Zone 8 during ServiceWindow-17. CalibrationGrantPolicy-v4 remains current, the grant still covers that system-role kind, procedure, zone, and window, and no valid revocation or supersession has ended this occurrence; this D-* claim records the grant but does not institute it.

A-CAL-01 (Gate predicate). CalibrationEntryAdmissible(plan, checkTime) holds only if MaintenanceCalibrationGrant-17 is current for the plan’s beneficiary, action, zone, and time and no applicable permission/norm conflict finding is unresolved. The predicate takes those inputs; it creates neither the grant, a conflict result, nor an actual gate decision.

E-CAL-02 (Actual Work and actor). Through its A.13 core, admitted system Tech-17 is the exact actual performer for this case under obtaining assignment Tech-17@Shift-B, whose holder is Tech-17 and whose extent covers the early part of ServiceWindow-17. A.15.1 independently admits dated CalibrationWork-17B : U.Work from that performer, its Method, extent, and containing-System facts. Because this filled case expressly claims precise assignment-bound attribution, F.6 separately relates CalibrationWork-17B to that same assignment. The assignment neither acts nor identifies the performer; failed attribution would leave the Work intact and remove only the under-assignment claim.

E-CAL-03 (Optional exercise claim). Because this case asks whether the grant was used, CalibrationExercise-17B : PermissionExerciseRelation@Context connects CalibrationWork-17B to MaintenanceCalibrationGrant-17: the Work instantiates CalibrationProcedure-v3; Tech-17@Shift-B is an assignment occurrence whose declared species uses MaintenanceTechnicianSystemRoleKindDomain as its assigned-kind domain, and the occurrence supplies MaintenanceTechnicianSystemRole as the value admitted by that domain; and the Work occurs in Zone 8 within ServiceWindow-17 while the grant is current. If the action or beneficiary test failed, this exercise relation would not obtain.

D-CAL-02 (Exercise non-use boundary). The authoring rule says to add E-CAL-03 only when the reader needs to know whether the grant was exercised; otherwise stop with the separately named grant and Work. This is a generic prescription for boundary text, not a claim that one particular author bears an individual U.Commitment.

E-CAL-04 (Later non-violation finding). Through its A.13 core, admitted system ComplianceEvaluator-4 is the exact actual performer under obtaining assignment ComplianceEvaluator-4@QualityShift. A.15.1 independently admits dated CalibrationComplianceEvaluation-17B : U.Work; because this finding expressly preserves precise assignment-bound attribution, F.6 separately relates that Work to the same assignment. The Work checked CalibrationWork-17B against current PlantCalibrationNormativeFrame-17, explicitly complete enough for this technician, procedure, zone, and evaluation window, and returned CalibrationNonViolation-17B : NonViolationFinding@Context(result=nonViolating). A stale or insufficient frame would return unresolved; a missing or failed F.6 relation would instead leave the Work and evaluation result intact while removing only the attribution.

E-CAL-05 (Evidence for reliance). An A.10 evidence-provenance path links the exact CalibrationNonViolation-17B finding to CalibrationComplianceEvaluation-17B, ComplianceEvaluator-4@QualityShift, CalibrationRunLog-17B, the log’s source and currentness relations, and the bounded audit context. The path supports reliance on the finding; the log, assignment, and path do not perform the evaluation or create its result.

E-CAL-06 (Unresolved conflict). After CalibrationWork-17B and its evaluation, Zone8EntryProhibition-17 becomes current for the same beneficiary, action, zone, and the remaining service window, including the calibration action specified by CalibrationWorkPlan-17C; no applicable rule selects an outcome and no authorized dated decision Work with a current resolution result exists. CalibrationConflict-17 : PermissionNormConflictFinding@Context therefore remains unresolved.

E-CAL-07 (Source/display fact). SignedGrantRecord-17 and GreenPermitTile-17 are visible carriers in this case; their presence is an observed source/display claim only.

E-CAL-08 (Gate decision result). At the later entry check, CalibrationEntryResult-17C : GateDecisionResult has gateRef=CalibrationEntryGate-17, decisionSubjectRef=CalibrationWorkPlan-17C, boundedActionRef=StartCalibrationProcedure-v3-in-Zone8-17C, and profileApplicationRef=CalibrationEntryProfileApplication-17C. The current profile application uses the complete required set {CalibrationGrantCurrentCheck-17C, CalibrationConflictResolvedCheck-17C} : GateCheckApplicationResult[]: the current-grant application maps to pass, while the exact CalibrationConflict-17=unresolved source outcome maps to block. The result records decisionValue=block, action consequence “hold CalibrationWorkPlan-17C outside entry”, the remaining Zone 8 service scope and window, and recheck when the grant, conflict result, profile, scope, or window changes. It neither resolves the conflict nor revokes MaintenanceCalibrationGrant-17.

L-CAL-01 (Tempting wrong classification, rejected). “The visible permit is D, so the grant exists, the Work exercised it, and the Work was non-violating” is not one atomic claim and is false as a classification shortcut. The carrier observation is E-CAL-07; the grant, exercise, evaluation finding, and E-CAL-08 gate result remain the separately classified claims above.