Library / First Principles Framework (FPF) - Core Conceptual Specification
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 05:29:54 UTC · snapshot created 2026-10-03 05:30:57 UTC · last check 2026-10-03 05:55:15 UTC

A.6.H:4.5 - Unpack complete, turnkey, and end-to-end

Ask what the next reader may do because the claim is supposedly complete.

Candidate readingWhat must be namedDirect return
Complete whole or assemblycandidate whole, identity, boundary, required parts, direct relations, construction rule when current, and completion predicateA.1, A.14, C.13, A.22, or the exact construction/completion pattern
Specification coverageexact claim-bearing episteme, described EntityOfConcern, effective ReferenceScheme, required content or criterion set, coverage predicate, scope, and gapsC.2.1 and the exact coverage/evaluation pattern; A.3.2 only when the episteme is classified or used as a MethodDescription under its membership rule
Capability coverageexact holder, capabilities, required actions or conditions, scope, and direct coverage criterionA.2.2 and the exact capability/coverage pattern
Work coverage or completionexact Work occurrence(s), temporal extent, performed parts or episodes when needed, completion or production predicate, acceptance boundary, and evidenceA.15.1, A.15.PROD, or the exact completion/acceptance pattern
Evidence coverageexact claim set, evidence-bearing objects, evidence-use relations, scope, limitations, and relying useA.10; B.3 only for an assurance claim
End-to-end method or workflowexact Methods, method parts and joins, exposed interactions, failure and stop conditions; performed runs remain separateA.3.1 and B.1.5, with A.15.1 for actual Work

A sentence may require several rows. Write several direct claims; an ordinary note may hold them when each remains separately recoverable.