A.6.M:4.5 - Worked slices
Ports line up.
Phrase:
"The ports line up, so the modules are compatible."
ModuleRelationRepairNote:
wholeHolonRef: VehicleControlSystem
candidateModuleHolonRef: BrakeControllerPackage
effectiveReferenceScheme: VehicleControlInterfaceScheme-2026Q2
claimScope: BrakeControllerReleaseUse-2026Q2
directModuleRelationDisposition: noDirectRelationClaimed
boundaryRef: BrakeControlBoundary
interfaceSpecificationGap: endpoint names are present, but protocol and semantic conditions are still missing
admissibilityConditions: not yet declared
substitutabilityPolicyRef: missing
changePolicyRef: missing
claimBoundary: interface-spec repair; no evidence or gate claim yet
notAModuleBecause: port labels alone do not establish implemented interface compatibility
governedNonModuleClaimPatternRefs: A.6.5 for endpoint slots; A.6.B only if L, A, D, or E boundary-package statement classification is current; A.6.M only if a module-interface or substitution claim remains
stopCondition: endpoint slots and missing interface-spec fields are visible
Open platform claim.
Phrase:
"This is an open platform."
OpenArchitectureClaim:
architectureClaimRef:
platformGrammarRef:
interfaceSpecificationRefs:
variabilitySlotRefs:
substitutabilityPolicyRef:
changePolicyRef:
conformanceExpectationRefs:
evidenceOrSourceRelianceRefs?:
nonAdmissibleUse:
"open" does not by itself prove substitutability, interoperability,
assurance, procurement suitability, or architecture quality
The first slice repairs the claim without requiring measurement. The second slice applies MOSA-like conformance expectations and substitution policy only for the conformance or substitution claim being made.
Supplier-diversity, procurement suitability, use-context compatibility, business constraint, policy authorization, and provider-selection claims are not module-interface fields. If those claims are being made, A.6.M names only the module-interface slice; non-module selection, procurement, work, role, evidence, assurance, gate, release, and mechanism claims are governed by the patterns named in A.6.M:12.
Team boundary claim.
Phrase:
"The team communication boundary matches the module boundary."
ModuleRelationRepairNote:
wholeHolonRef: PaymentsPlatform
candidateModuleHolonRef: SettlementService
effectiveReferenceScheme: PaymentsPlatformInterfaceScheme-2026Q2
claimScope: SettlementServiceProductLineUse-2026Q2
directModuleRelationDisposition: noDirectRelationClaimed; team/module correspondence remains diagnostic
boundaryRef: SettlementServiceBoundary
interfaceSpecificationGap: the service API exists, but semantic versioning, data schema, and semantic conditions are incomplete
admissibilityConditions: admitted team-delivery and on-call responsibility predicates obtain for their actual Systems, scopes, and intervals; otherwise record the exact missing governor; substitutability not established
substitutabilityPolicyRef: missing
changePolicyRef: missing
claimBoundary: exact system-role assignment, direct responsibility relation, Work, and procedural correspondence first; module-interface relation only after boundary and interface specification are declared
notAModuleBecause: team communication boundary and an independently obtaining delivery-responsibility relation do not by themselves establish module interface, substitutability, or compatibility
governedNonModuleClaimPatternRefs: A.15 and A.2 for team and work claims; C.29 if the team-to-module correspondence is claimed as homomorphism-like or almost-same structure; A.6.M only for the declared module-interface relation
stopCondition: the correspondence is usable as an architecture diagnostic, not as proof
The third slice uses Conway-like mirroring as a diagnostic prompt. It does not make organization structure, communication relations, a system-role assignment, or delivery responsibility into module-interface structure by identity. The responsibility claim remains valid only through its own admitted direct predicate or returns the exact missing governor.
Proxy-cost replay: if a repair proposes more modules, more open interfaces, or more parallel transformation-flow paths, name what may get worse before claiming improvement. Synchronization work, communication overhead, conformance work, shared-resource pressure, hidden exception cost, or cross-boundary change cost can become the claim being made. A.6.M repairs only the module-interface relation; speedup, bottleneck, modularity, measurement, work, and quality tradeoffs are governed by C.29, E.18, C.31, C.16, A.15, or the related subject pattern named by value when that related claim is being made.