A.7:6.2 - Progressive technical examples
Pump in a cooling loop. Pump P-12 circulated coolant during the 10:00-10:45 run. If that sentence remains ordinary actor wording, no full performance record is required. For a precise Work claim, recover the actual performer and its A.13 core, then use A.15.1 to admit the dated run independently with at least one Method actually followed, the interval, and an obtaining containing-System relation. That core includes an obtaining assignment, here CoolingLoopCirculationAssignment-17, its admitted species, holder and assigned-kind participants. Add F.6 only if the claim must also identify the assignment under which the run was performed. Add Capability and another Method only for their own claims; none follows merely from the noun pump.
Standard used in a design. The design team used Safety Standard S-174 when selecting valve V-12. The standard is an episteme and does not act. Its PDF and printed volume are carriers; name them when the receiving source or evidence claim uses them. Valve Selection SOP v5 is a MethodDescription only after the A.3.2 membership test; the ordinary sentence does not require an assignment. A reliance-bearing Work account uses A.13 to identify the actual performer and A.15.1 to admit ValveSelectionWork-47 independently. Keep its :2 admission basis, including the core assignment and Method actually followed, recoverable. Add F.6 only if the account must also say under which assignment the Work was performed. Evidence use and current source edition remain separate.
Set and team. {Alice, Bob, 3.14} is a set and cannot act. Cooling maintenance team T repaired pump P-12 is ordinary actor wording when T is already recoverable as a collective System. Add its coordination Method, Work occurrence, local system-role kind, or assignment only when the corresponding stronger claim is current.