B.1.1:5.3 - Work Plan And Work Occurrence
Source graph: Prep -> Weld -> Paint.
If the graph describes a method or process view, use the patterns that define the method, description, and order claims. If it describes performed Work, use A.15.1 with occurrence identity, timing, evidence, and the exact Work relation. Do not let the same graph do both jobs.