| Method as semantic way of doing | A.3.1 |
| Method description, SOP, algorithm text, simulator configuration, or formal expression | A.3.2, with publication owners when publication use is current |
| Work plan | A.15.2 |
| Dated work occurrence, performed episode, or evidence that work happened | A.15.1 |
| Work-resource roll-up, spent resource, cost, effort, energy, material, or comparable ledger | B.1.6 |
| Episteme identity and historical continuity between distinct epistemes | C.2.1; aggregate only exact identities and an already obtaining EpistemeEditionRelation when the bounded use needs their chronology |
Proper PhaseOf, portion, membership, or other parthood relation for a non-Work carrier | A.14, B.1, and C.13 as appropriate; Work temporal and part relations remain with A.15.1 |
| Holon delimitation or boundary-crossing relation | A.1, B.1, A.12, A.3.4, or the pattern that defines the exact relation |
| Bounded change under conditions | A.3.4 |
| Whole reidentification, emergence-family wording, MHT, MET, MFT, synergy, or metric-mirage wording | Use B.2.P when emergence-family wording hides the claim kind. If a whole-reidentification question remains, including one raised by an autonomy or capability change, use B.2; B.2.2 and B.2.3 handle System and Episteme result recognition, and B.2.4 is the capability/functioning decision bridge. Use B.2.5 separately for an exact two-sided supervisor-subholon feedback claim, whether or not whole reidentification is current. |
| Architecture structural view or selected structure | C.30.ASV, A.22, or the pattern that defines or tests the architecture claim |
| Mathematical order, graph, algebraic notation, graph path, or morphism used as expression | Use C.29 when mathematical-lens adequacy, preserved structure, lost structure, payoff, or stop condition is being evaluated. Use E.18 when the selected transformation-flow structure is current. Use E.18.2 when the mathematical expression of that selected structure is current. |