Library / First Principles Framework (FPF) - Core Conceptual Specification
Jump to passage
In this reading

Link to current text

Published source confirmed at last check

Source changed 2026-10-03 05:29:54 UTC · snapshot created 2026-10-03 05:30:57 UTC · last check 2026-10-03 06:35:10 UTC

B.1.5:4.5.1 - Planning And Performed-Work Obligations

B.1.5 has three common use positions, but they are positions in use, not U-kinds:

  • Planning or description-side use. A planner system performing planning Work recovers the exact Methods, methodPartOf occurrences, whole-forming claims at their A.6.RCD dispositions, any justified order aggregation, typed joins or adapters, interface boundary, invariants, and whole-level commitments. A resulting exact U.WorkPlan may cite the MethodDescription edition on which it relies; neither the planning Work nor the plan is the reader that defines Method identity.
  • Performed-work use. Recover each exact actual performer through A.13, let A.15.1 independently admit the Work, and recover the exact enactsMethod occurrence for the whole Work. Add the exact covering A.2.1 assignment and F.6 relation only when this use expressly consumes precise assignment-bound attribution; missing or failed F.6 leaves the Work and enactment intact. Check capability fit or admission only when the work-entry decision consumes those claims; then check preconditions, order conformance, and exposed or forwarded interactions through their subject patterns. State resource use, evidence, and results only through their own obtaining relations. None becomes part of the method.
  • Assurance use. Identify cutset submethods, fragile typed joins, adapter points, mapping congruence or CL-sensitive edges, and the envelope or scope in which the composite method is expected to hold. B.3 and related assurance patterns evaluate those hooks; B.1.5 only makes them visible.

Useful invariants remain: a single recovered submethod composed alone does not create a surprising new Method; order is deterministic only under the exact order claims and conditions at their selected A.6.RCD dispositions; any throughput or quality bound must name its characteristic, critical path, and weakest-link basis; strengthening a submethod, adapter, or typed join should not make the composite Method worse unless a stated side condition changes.