C.17:1.3 - Dated overall-assessment branch
Open this branch only when the claim says that an overall assessment actually occurred and later reliance needs that fact. Recover the evaluator System through A.13 and the admitted Method through A.3.1, then use A.15.1 to independently admit the dated Work that enacts that Method. Add the exact A.2.1 assignment occurrence and F.6 relation only when later reliance expressly consumes precise assignment-bound attribution through the same obtaining A.13 assignment; missing or failed F.6 leaves the assessment Work intact. Only the evaluator System performs the Work. A separate MethodDescription may explain the reusable Method; it is not enacted. Coordinate-measurement Work remains its own C.16 Work, and the aggregate result states claims.
Do not infer an A.6.1 operation application from the Method, Work, configuration, or result. If a receiving claim separately asserts an exact operation application or binding, satisfy the current A.6.1 application account and cite that application. Otherwise retain only the C.17-local evaluator System, assignment, Method enactment, dated assessment Work, coordinate results, and aggregate result that the claim actually needs.