Source changed 2026-10-03 11:52:20 UTC · snapshot created 2026-10-03 11:53:41 UTC · last check 2026-10-03 12:20:10 UTC
C.22.1:8 - Corridor, transfer, and durability discipline
If the adaptation claim depends on entering a new solution corridor, publish the corridorEntryBaseline first: the prior repertoire, baseline set, or comparison family relative to which corridor entry is being claimed.
Then publish the corridorEntryEvidence that marks real entry into that corridor rather than exotic accident, for example a reproducible solution class, a stable descriptor shift, or one explicit stepping-stone sequence.
If a stepping stone mattered, publish the stepping-stone evidence as part of the adaptation signature rather than treating it as retrospective color.
Corridor or stepping-stone notes do not replace the work-measure threshold account; they explain why the adaptation path matters, not whether the threshold was actually reached.
A fast threshold result is not yet enough to claim durable specialization.
If transfer to a neighboring task family is claimed, name the transfer target and the observed gain explicitly.
If retention is claimed, name the reuse or retention window rather than letting durability hide inside one isolated run.
If specialization harms neighboring task families, narrows reusable competence, or creates de-specialization cost, publish that in downsideEffect? rather than telling only the upside story.
If post-threshold performance matters to later exploitation, publish postThresholdEfficiency? so the claim is not trapped at the threshold-crossing moment only.